Council Bluff Primary Electric And Well Improvements
- Response deadline
- Sep 28, 2026 Due in 12 days
- Date posted
- Sep 16, 2026
- Source
- Open notice
Description
Amendment 0001 changes time zones and NAICS code is attached. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240LT26Q0172 is issued as a Request for Quotation (RFQ) for MARK TWAIN NATIONAL FOREST COUNCIL BLUFF PRIMARY ELECTRIC AND WELL IMPROVEMENTS. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 283210. The small business size standard is $19 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. The Work consists of coordinating with Ameren to extend their existing primary electric line from an overhead power line located near Missouri State Highway DD to the Wild Boar Campground. This includes coming off an existing electric pole on the east side of the highway and installing buried line along the edge of the cleared highway right-of-way to the existing well within the Council Bluff Recreation Area. The corridor will parallel the east side of Missouri State Highway DD for approximately 9,600 feet and then use an “old road corridor” along the top of Wild Boar Ridge leading to the well for approximately 3,100 feet.
Classifications
Documents (7)
- 5_WD_MO20260001_07302026.pdf.pdf124 KBNot yet available
- Amendment 0001.pdf.pdf85 KBNot yet available
- 1240LT26Q0172_SF1442.pdf.pdf102 KBNot yet available
- 2 CBPEWI_SOI.pdf.pdf170 KBNot yet available
- 3 Combined SpecsCBPEWI20260624.pdf.pdf3.0 MBNot yet available
- 4 Combined Drawings_CBPEWI.pdf.pdf631 KBNot yet available
- 1 Solicitation0_Council Bluff Primary Electric and Well Improvements.pdf.pdf920 KBNot yet available
Contacts
Similar contracts
- Power Construction and Services II (PCS II) MATOCDue Oct 13, 2026
- Transformer Relocation at Kentucky LockDue Sep 21, 2026
- P283 Electrical Infrastructure, On-Site Generation, and Microgrid Improvements at Marine Corps Air Station Miramar, San Diego, CaliforniaCaliforniaDue Oct 14, 2026
- Y--COTP Series Capacitor Two-Phase Design BuildDue Oct 30, 2026
- Big Bend 230kV Tie-Line Switch ReplacementDue Oct 5, 2026
- Sources Sought Announcement / Industry Day for Sentinel Utility Corridor at Malmstrom Air Force Base, MontanaMontanaDue Sep 24, 2026