MSANG CRTC 125kW Generator and ATS
- Response deadline
- Sep 21, 2026 Closed
- Date posted
- Sep 18, 2026
- Source
- Open notice
Description
****Update 18 Sep 2026**** Additonal Questions and Answers attached. ****Update 17 Sep 2026**** Site visit completed on 16 Sep, roster uploaded. Questions and Answers attached. The Contractor shall provide turnkey procurement, installation, and testing of a backup power system at Bldg 70 of the MSANG CRTC located at 4715 Hewes Ave, Gulfport, MS 39507. Key Requirements: - 1x 125kW Diesel Generator1x 1200A Automatic Transfer Switch (ATS)4x #500kCM Copper Conductors (~30 ft run) - Complete turnkey installation, site preparation, and utility integration - System/load bank testing, base personnel training, O&M manuals Reference Documents Attachment 1: Statement of Work (SOW) Attachment 2: Site Map Site Survey will be held on Wednesday 16 September 2026 at 1000 CST. Please respond by 15 September at 1300 CST if you plan on attending. 4715 Hewes Ave, Gulfport, MS 39507
Classifications
Documents (7)
- Combined Synopsis Solicitation - 26Q-A010 - Bldg 70 Generator and ATS.pdf.pdf438 KBNot yet available
- Site Visit Roster.pdf.pdf67 KBNot yet available
- Attachment 2 - Site Map.pdf.pdf1.4 MBNot yet available
- Davis-Bacon Act WD MS20260050.pdf.pdf1.5 MBNot yet available
- Additional Questions and Answers - Bldg 70.pdf.pdf143 KBNot yet available
- Questions and Answers - Bldg 70 Generator and ATS.pdf.pdf109 KBNot yet available
- Attachment 1 - Statement of Work.pdf.pdf147 KBNot yet available
Contacts
Similar contracts
- FY27 Electrical Test and CalibrationsNYDue Nov 13, 2026
- 657A5-26-111, Triennial Electrical TestingIllinoisDue Nov 13, 2026
- 460-24-009 CLC and Fourth Floor Patient Elopement SystemDEDue Nov 16, 2026
- 106 Ce Electrical Loop RepairDue Nov 10, 2026
- Project No. 583-22-106- Replace Electrical Panels & Expand DistributionDue Dec 9, 2026
- Tri-Annual PM & Testing of Switch Gears - Base YearDue Nov 12, 2026