Flooring Replacement, Stairwell Pad Upgrades, Door/Frame Painting, and Hallway Wall Repairs (Mississippi State, MS)
- Response deadline
- Sep 23, 2026 Closed
- Date posted
- Sep 10, 2026
- Source
- Open notice
Description
****AMENDMENT 0001**** The purpose of this amendment is to provide a copy of the Site Visit Sign In Sheet (see attached). ### This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. Solicitation number 1232SA26Q1466 is issued as a Request for Quotation (RFQ). United States Department of Agriculture (USDA), Agricultural Research Service (ARS), Crop Science Research Laboratory in Mississippi State, MS has a construction requirement for Flooring Replacement, Stairwell Pad Upgrades, Door/Frame Painting, and Hallway Wall Repairs. See attached Statement of Work for a complete description of requirements. This acquisition set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. The applicable North American Industry Classification Standard Code is 236220. The small business size standard is $45M. This acquisition is a total small business set aside. All responsible sources may submit a quotation which will be considered by the agency.
Classifications
Documents (5)
- SF30_1232SA26Q1466_0001.pdf.pdf106 KBNot yet available
- Site Visit Sign In Sheet.pdf.pdf339 KBNot yet available
- C04 Attachment 2 Statement of Work.pdf.pdf2.7 MBNot yet available
- C04 Attachment 3 - DOL MS20260045_2026_05_18.pdf.pdf36 KBNot yet available
- C04 Attachment 1 Solicitation Terms and Conditions_1232SA26Q1466.pdf.pdf338 KBNot yet available
Contacts
Similar contracts
- NRM-CONST | 561-18-140 Main Kitchen Upgrade Construction | FY27 NRMNew JerseyDue Nov 20, 2026
- 460-26-999 | Condenser Water Piping ModificationDelawareDue Nov 20, 2026
- Modernize 6N Inpatient Restrooms (Swing for 3N)LouisianaDue Dec 7, 2026
- Robins RAPID Construction OTA Progressive Design Build Fiber ReplacementGeorgiaDue Nov 20, 2026
- Callao, Peru Infrastructure Modernization - U.S. Army Corps of Engineers (USACE) – Latin America and Caribbean District (SAA)Due Dec 10, 2026
- F-15 Aerospace Ground Equipment (AGE) Facility, Vandenberg SFBCaliforniaDue Nov 20, 2026