B730 - Renovate RM106 for Emergency Operations Center
- Response deadline
- Sep 1, 2026 Closed
- Date posted
- Aug 6, 2026
- Source
- Open notice
Description
Amendment 0001: The purpose of this amendment is to: 1. Update the Statement of Work from 26 April 2026 to 5 August 2026. 2. Attach Appendix A - Cost Breakdown. 3. Attach the updated Floor Plan Drawings. 4. All other terms and conditions remain unchanged. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Notice 0001: The description below was edited to correctly reflect this requirement. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically. Description: The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete a full renovation of the existing alternate Emergency Operation Center (EOC). This includes performing analysis on security aspects of the alternate EOC and bringing it up to meet the UFC and AFI requirements. Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on 11 Aug 2026 at 9:00 AM CST. Attendance is highly encouraged but not mandatory. Please note that registration is required by 7:30 AM CST on 05 Aug 2026. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 7:30 AM CST on 05 Aug 2026, you will not be able to attend the site visit. Identification: All attendees must bring a valid photo ID. All photo IDs must meet the requirements for "REAL ID." Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance. IMPORTANT: All contractors should arrive at Columbus AFB’s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors’ center at 9:00 AM CST Additional Info: All RFIs must be submitted NLT 7:30 AM CST, on 17 Aug 2026. The range of magnitude for this procurement is between $250,000 and $500,000. 52.232-18 Availability of Funds. Availability of Funds (Apr 1984) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
Classifications
Documents (11)
- Download18 May Wage Determination.pdf.pdf47 KB
- B730-1st Floor drawing.pdf.pdf209 KBNot yet available
- DownloadAF Form 66 B730.xlsx.xlsx86 KB
- DownloadCUI Contractor Training Acknowledgment.pdf.pdf51 KB
- DownloadSolicitation - FA302226R0022.pdf.pdf574 KB
- DownloadAppendix A Cost Breakdown.xlsx.xlsx11 KB
- DownloadEAL Form.pdf.pdf293 KB
- DownloadCUI Contractor Training Slides.pptx.pptx644 KB
- DownloadSolicitation Amendment FA302226R00220001 SF 30 CO Signed.pdf.pdf389 KB
- Download5 August Statement of Work B730.pdf.pdf592 KB
- Floor Plan Drawings.pdf.pdf797 KBNot yet available
Contacts
- daniel.stilts.1@us.af.mil6624343740
- kennedy.fish.1@us.af.mil6624347226
Similar contracts
- 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221OklahomaDue Oct 30, 2026
- Sources Sought / Market Intelligence: Multi-Projects for Army Reserve Program – Construction Management at Risk (CM@Risk) utilizing Other Transaction Authority (OTA)Due Oct 5, 2026
- PLA Survey for Human Performance Wig Lab at WPAFBOhioDue Oct 7, 2026
- HST Roof Safety Construction ProjectDistrict of ColumbiaDue Oct 19, 2026
- Construct US Space Force Integration Facility, F/10852 Wpafb, OhioOhioDue Oct 6, 2026
- Fort Lee Vehicle Recovery RangeVirginiaDue Oct 13, 2026