Civic AI
Civic AI
Procurement intelligence
SAM.govFA302226R0022
Open

B730 - Renovate RM106 for Emergency Operations Center

DEPT OF DEFENSE · Mississippi
Response deadline
Sep 1, 2026
Due in 13 days
Date posted
Aug 19, 2026

Description

Amendment 0002: The purpose of this amendment is to: 1. Attach AS-BUILTS-PHASE-1 and AS-BUILTS-PHASE-2 2. All other terms and conditions remain unchanged. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Notice 0002: All RFI questions with answers have been posted to Attachments/Links along with the Site Visit Sign in Sheet. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Amendment 0001: The purpose of this amendment is to: 1. Update the Statement of Work from 26 April 2026 to 5 August 2026. 2. Attach Appendix A - Cost Breakdown. 3. Attach the updated Floor Plan Drawings. 4. All other terms and conditions remain unchanged. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Notice 0001: The description below was edited to correctly reflect this requirement. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically. Description: The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete a full renovation of the existing alternate Emergency Operation Center (EOC). This includes performing analysis on security aspects of the alternate EOC and bringing it up to meet the UFC and AFI requirements. Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on 11 Aug 2026 at 9:00 AM CST. Attendance is highly encouraged but not mandatory. Please note that registration is required by 7:30 AM CST on 05 Aug 2026. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 7:30 AM CST on 05 Aug 2026, you will not be able to attend the site visit. Identification: All attendees must bring a valid photo ID. All photo IDs must meet the requirements for "REAL ID." Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance. IMPORTANT: All contractors should arrive at Columbus AFB’s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors’ center at 9:00 AM CST Additional Info: All RFIs must be submitted NLT 7:30 AM CST, on 17 Aug 2026. The range of magnitude for this procurement is between $250,000 and $500,000. 52.232-18 Availability of Funds. Availability of Funds (Apr 1984) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

Classifications

Documents (16)

  • 18 May Wage Determination.pdf
    .pdf47 KBNot yet available
  • B730-1st Floor drawing.pdf
    .pdf209 KBNot yet available
  • AF Form 66 B730.xlsx
    .xlsx86 KBNot yet available
  • Solicitation Amendment FA302226R00220002 SF 30.pdf
    .pdf386 KBNot yet available
  • 1. AS-BUILTS-PHASE 1.zip
    .zip192.0 MBNot yet available
  • CUI Contractor Training Acknowledgment.pdf
    .pdf51 KBNot yet available
  • Solicitation - FA302226R0022.pdf
    .pdf574 KBNot yet available
  • B730 Renovate Rm 106 RFIs (002).docx
    .docx17 KBNot yet available
  • Appendix A Cost Breakdown.xlsx
    .xlsx11 KBNot yet available
  • EAL Form.pdf
    .pdf293 KBNot yet available
  • CUI Contractor Training Slides.pptx
    .pptx644 KBNot yet available
  • Solicitation Amendment FA302226R00220001 SF 30 CO Signed.pdf
    .pdf389 KBNot yet available
  • 5 August Statement of Work B730.pdf
    .pdf592 KBNot yet available
  • Site Visit Sign in Sheet.pdf
    .pdf63 KBNot yet available
  • 2. AS-BUILTS-PHASE 2.zip
    .zip138.4 MBNot yet available
  • Floor Plan Drawings.pdf
    .pdf797 KBNot yet available

Contacts

Similar contracts

Explore more