ARS - Supply and Install Emergency Power Transfer Switch and Controls USDA-ARS 141 Experiment Station Road, Stoneville, Mississippi
- Response deadline
- Sep 25, 2026 Closed
- Date posted
- Sep 23, 2026
- Source
- Open notice
Description
UPDATE: Due date for quotes has been extended to September 25, 2026 at 1300 Local Time. A Q&A will be posted for clarification purposes. Please stay tuned to the most current version of this notice for more details. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes only solicitation. Quotations are being requested and separate written solicitation will not be issued. Solicitation number 1174579 is issued as a Request for Quotation (RFQ) for Supply and Install Emergency Power Transfer Switch and Controls at the USDA-ARS 141 Experiment Station Road, Stoneville, Mississippi 38776 as listed in the statement of work. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238210 The small business size standard is $19 million This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Submit offer by email to nicholas.bartolomei@usda.gov so that it is delivered into this inbox by the due date and time listed on the announcement page of SAM.gov. Emails should contain attachments in Microsoft Word, Excel, or Adobe PDF format. Be aware that large attachments may increase the time required to deliver an email. It is the offerors responsibility to confirm receipt of the offer from Contract Specialist, Nicholas Bartolomei.
Classifications
Documents (3)
- Attachment 2 - Wage Determination 1174573.pdf.pdf68 KBNot yet available
- Attachment 1 - Statement of Work 1174573.pdf.pdf1.2 MBNot yet available
- 1174573 Solicitation.pdf.pdf471 KBNot yet available
Contacts
Similar contracts
- FY27 Electrical Test and CalibrationsNYDue Nov 13, 2026
- 657A5-26-111, Triennial Electrical TestingIllinoisDue Nov 13, 2026
- 460-24-009 CLC and Fourth Floor Patient Elopement SystemDEDue Nov 16, 2026
- 106 Ce Electrical Loop RepairDue Nov 10, 2026
- Project No. 583-22-106- Replace Electrical Panels & Expand DistributionDue Dec 9, 2026
- Tri-Annual PM & Testing of Switch Gears - Base YearDue Nov 12, 2026