Minuteman III, ICBM Assembly Spec
- Response deadline
- Jul 24, 2026 Closed
- Date posted
- Jul 14, 2026
- Source
- Open notice
Description
The purpose of this solicitation is to procure the following: Line Item 0001, First Article, NSN 5995014659869AH Cable Assembly, Spec, PN 333074000510, Qty-1 Line Item 0002, Test/Inspection Report , CDRL-A002, PN333074000510, Qty-1 Line Item 0003, Production Articles, NSN 5995014659869AH Cable Assembly, Spec, PN 333074000510, Qty-10 Line Item 0004, Production Articles, NSN 5995014617065AH Cable Assembly, Spec,PN333074003610,Qty-4 Line Item 0005, Production Articles, NSN 5995014619787AH Cable Assembly, Spec,PN333074002510,Qty-3 We confirmed that part 33307-90008-1 is manufactured and sold by Molex under part number V310200000. Please note that contractors are not restricted to purchase from the vendors listed under the Suggested Sources of Supply. Those sources are recommendations, not requirements. Contractors are fully authorized to procure this part from any distributor, provided it meets the technical specifications outlined in the drawing. Instructions: Send quote for the above via email to camie.connelly@us.af.mil & tyler.groves.8@us.af.mil on/before 17 July 2026 3:30 pm MDT
Classifications
Documents (13)
- UNMARKED STATEMENT 2022.pdf.pdf513 KBNot yet available
- Engineering_Data_List_5995014617065AH.pdf.pdf56 KBNot yet available
- 014619787.zip.zip743 KBNot yet available
- FA8206-26-Q-0004.pdf.pdf199 KBNot yet available
- Transportation.pdf.pdf639 KBNot yet available
- 014617065.zip.zip1.1 MBNot yet available
- PackagingRequirements.pdf.pdf838 KBNot yet available
- 1423CDRL.pdf.pdf123 KBNot yet available
- Engineering_Data_List_5995014619787AH.pdf.pdf56 KBNot yet available
- 014659869.zip.zip19.7 MBNot yet available
- 1300830010(V310200000).pdf.pdf251 KBNot yet available
- Engineering_Data_List_5995014659869AH.pdf.pdf62 KBNot yet available
- SOWPackaging.pdf.pdf138 KBNot yet available
Contacts
- camie.connelly@us.af.mil8017756966
- tyler.groves.8@us.af.mil8015868486
Similar contracts
- Panel, Structural, Ai - and Other Replacement PartsDue Sep 28, 2026
- Audio Distribution System for Human Space FlightTexasDue Sep 14, 2026
- Cover, Guided Missile GDue Sep 3, 2026
- Flight Test, Telemetry and Termination (FT3) Flight Test Kit ProductionUtahDue Feb 19, 2027
- Detent Assembly, GuidedDue Sep 7, 2026
- Adapter, Hellfire Missile (Upper) and Adapter, Hellfire Missile (Lower)Due Sep 25, 2026