1.18 mi of hot mix asphalt roadway reconstruction including storm sewer, sanitary sewer, concrete curb, gutter and sidewalk, culvert replacements, retaining wal
- Response deadline
- Dec 4, 2026 Due in 35 days
- Date posted
- Oct 30, 2026
- Source
- Open notice
Description
1.18 mi of hot mix asphalt roadway reconstruction including storm sewer, sanitary sewer, concrete curb, gutter and sidewalk, culvert replacements, retaining walls, bridge superstructure replacement, temporary bridge, guardrail, signing and pavement markings on M-49 from the south village limit to north village limit of Camden, Hillsdale County. This is an Alternate Beam Bid project. Alternate 1 (Section 3) is a Galvanized Press-Brake-Formed Tub Girder Alternative. Alternate 2 (Section 4) is a Plate Girder Alternative. This project includes a 5 year materials and workmanship pavement warranty and a 2 year concrete surface coating warranty. ** 17341 Ea or Comb/Jt. 17341 Fa, K **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ea, Fa and K. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Counties: Hillsdale County, Jackson County Eligibility: Eligible
Documents
No documents posted for this opportunity.
Similar contracts
- 15012-218672MIDue Oct 2, 2026
- 15000-214822MIDue Oct 2, 2026
- 15091-223796MIDue Oct 2, 2026
- 22000-226983MIDue Oct 2, 2026
- 20000-220461MIDue Oct 2, 2026
- 03000-226384MIDue Oct 2, 2026