2.10 mi of hot mix asphalt reconstruction, drainage, shared-use path construction, concrete curb, gutter and sidewalk, box culvert replacement, guardrail, geote
- Response deadline
- Nov 6, 2026 Due in 42 days
- Date posted
- Sep 25, 2026
- Source
- Open notice
Description
2.10 mi of hot mix asphalt reconstruction, drainage, shared-use path construction, concrete curb, gutter and sidewalk, box culvert replacement, guardrail, geotechnical construction, signage and pavement markings on M-66 from south of Tuttle Road to Wells Street in the city of Ionia, Ionia County. This Project includes a 5 year materials and workmanship pavement warranty and a 2 year concrete surface coating warranty. Mandatory pre-bid meeting on Thursday, October 15, 2026 at 10:00 a.m. at the MDOT Grand Rapids TSC Office, 2660 Leonard Street NE, Grand Rapids Michigan 49525. ** 34799 Ea or 34799 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea, Fa and K. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Counties: Ionia County Highway: 66 Eligibility: Eligible
Documents
No documents posted for this opportunity.
Similar contracts
- 15091-223796MIDue Oct 2, 2026
- 15012-218672MIDue Oct 2, 2026
- 22000-226983MIDue Oct 2, 2026
- 59042-214021MIDue Oct 2, 2026
- 29011-214897MIDue Oct 2, 2026
- 03000-226384MIDue Oct 2, 2026