1.37 mi of hot mix asphalt reconstruction, 2.77 mi of hot mix asphalt cold milling and overlay, partial deck replacement, deck patching, epoxy overlay, expansio
- Response deadline
- Nov 6, 2026 Due in 42 days
- Date posted
- Sep 25, 2026
- Source
- Open notice
Description
1.37 mi of hot mix asphalt reconstruction, 2.77 mi of hot mix asphalt cold milling and overlay, partial deck replacement, deck patching, epoxy overlay, expansion joint replacement, substructure patching, silane treatment, epoxy injecting box beams, barrier patching, downspout installation, scour countermeasure, full depth pavement repairs, storm sewer, concrete curb and gutter, driveway and sidewalk, signing, signals, lighting, guardrail, underdrain and pavement markings on M-150 from Tienken Road southerly to Paint Creek and M-150 from Clinton River southerly to M-59 in the city of Rochester Hills, Oakland County. This project includes two 5 year materials and workmanship pavement warranties, a 2 year concrete surface coating warranty, and a 5 year pavement performance warranty. ** Comb/Jt. 42550 Cb, Ea or Comb/Jt. 42550 Cb, K or Comb/Jt. 42550 Ea, K **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and K. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Counties: Oakland County Highway: 150 Eligibility: Eligible
Documents
No documents posted for this opportunity.
Similar contracts
- 15091-223796MIDue Oct 2, 2026
- 15012-218672MIDue Oct 2, 2026
- 22000-226983MIDue Oct 2, 2026
- 59042-214021MIDue Oct 2, 2026
- 29011-214897MIDue Oct 2, 2026
- 03000-226384MIDue Oct 2, 2026