25132-210086
- Response deadline
- Nov 20, 2026 Due in 6 days
- Date posted
- Oct 9, 2026
- Source
- Open notice
Description
5.07 mi of road reconstruction, grading, drainage, watermain and storm sewer replacement, noise wall replacement, guardrail, concrete sidewalk, ramps, curb and gutter, traffic signals, signing, ITS, lighting, pavement markings, reconstruction of 8 structures, rehabilitation of 20 structures, 1 deck park conversion, removal of 8 structures, and approach work on I-475 from Thread Creek to Flint River in the cities of Flint and Burton, Genesee County. This project is an Alternate Pavement Bid Project. Alternate 1 (Section 2) is an Hot Mix Asphalt Alternative and includes a 5 year materials and workmanship pavement warranty. Alternate 2 (Section 3) is a Concrete Alternative and includes a 5 year materials and workmanship pavement warranty. This project also includes a 5 year epoxy overlay performance warranty, a 2 year bridge coating warranty, and a 2 year concrete surface coating warranty. ** 225052 Ea or 225052 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications Ea, Fa and either B or Cb. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Counties: Genesee County Eligibility: Eligible
Documents
No documents posted for this opportunity.
Similar contracts
- 15091-223796MIDue Oct 2, 2026
- 15012-218672MIDue Oct 2, 2026
- 22000-226983MIDue Oct 2, 2026
- 59042-214021MIDue Oct 2, 2026
- 29011-214897MIDue Oct 2, 2026
- 03000-226384MIDue Oct 2, 2026