SAM.gov19MA1026Q0010
Open
Power Monitoring Replacement
STATE, DEPARTMENT OF · MG-T
- Response deadline
- Aug 21, 2026 Closed
- Date posted
- Jul 17, 2026
- Source
- Open notice
Description
The power monitoring system at the US Embassy Antananarivo has been out of service since 2015. The existing system is obsolete and no longer meets operational requirements. The objective of this project is to replace the obsolete power monitoring system with a state-of-the-art system that provides real-time monitoring, data logging, and enhanced system reliability.
Classifications
Documents (2)
- RFQ Cover letter.docx.docx36 KBNot yet available
- RFQ letter.pdf.pdf209 KBNot yet available
Contacts
Similar contracts
- FEMA Region 6 Electric Motor Control Center ReplacementTexasDue Sep 25, 2026
- Humphreys Engineer Center Privatization of Electric SystemVirginia
- FEMA Region 6 Electric Motor Control Center ReplacementTexasDue Sep 21, 2026
- S--TEMP PUMPS ELECTRIC SERVICE at River Intake Facility
- S--Electric (Utility) Service for OJS DII Command Center
- Architect of the Capitol (AOC) Renewable Energy Certificate (Credit)District of ColumbiaDue Sep 16, 2026