HOIST, ELECTRIC
- Response deadline
- Aug 3, 2026 Closed
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
NSN: 2030 01-F16-4790 PART # HC2000-1A25-L-01 NOMENCLATURE: HOIST, ELECTRIC 65' QTY: 4 U/I: EA 3/4 HP TENV UL-LISTED WASHDOWN-DUTY MOTOR, 115 VAC 10 INPUT POWER, RATED FOR INTERMITTENT DUTY, AUTOMATIC, LOAD SUSPENDING BRAKE SYSTEM, PERMANENTLY LUBRICATED, HIGH-EFFICIENCY PLANETARY REDUCTION, EPOXY PAINT OVERCOAT, STAINLESS STEEL HARDWARE (WHERE APPLICABLE) NEMA 4X FIBERGLASS CONTROL ENCLOSURE, NEMA 6 RATED LOW-VOLTAGE HANDHELD PENDANT WITH MINI- CHANGE CONNECTOR AND 12' LEAD NOTE1; THIS APPLICATION HAD A 40-FT WIRE ROPE INCLUDED PREVIOUSLY. THAT WIRE ROPE WAS REMOVED FROM PD. WIRE ROPE WILL BE PURCHASED IN THE FUTURE SEPARATELY. INDIVIDUALLY PACKAGED IN ACCORDANCE WITH MIL-STD-2073-1 E METHOD 10, CUSHIONED IN A DOUBLE LAYER OF 3/4 IN BUBBLE WRAP AND PACKED IN AN APPROPRIATELY SIZED ASTM-D6880 CLASS 2 HEAVY DUTY SCREWED WOODEN BOX. MARKING IAW MIL-STD-129R EXCEPT BAR CODED IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY. FOR PACKING AND EQUIPMENT SPECIFICATION QUESTIONS ONLY POC IS BELOW: POC: BRADY MYERS EQUIPMENT SPECIALIST E-MAIL: BRADY.A.MYERS@USCG.MIL TEL: 571-613-3388 ☐Quality Assurance Q/A Inspection, if this block is checked, the contractor shall be responsible for notifying the Contracting Officer at least seven (07) calendar days prior to the contractor being ready for any Q/A inspections or testing as required. Are you able to meet packaging requirements? Yes ___ No ____ ** Total cost shall have delivery and any Freight charges to zip code 21226 included. ** ** SHIPPING: FOB DESTINATION REQUIRED. ** SHIP TO: USCG SURFACE FORCES LOGISTICS CENTER 2401 HAWKINS POINT ROAD RECEIVING ROOM- BUILDING 88 BALTIMORE, MD 21226 PLEASE SEE ATTACHMENTS
Classifications
Documents (2)
- FAR Clauses dated (1) (1).docx.docx35 KBNot yet available
- 70Z08526Q40213B00 SOLICITATION.docx.docx48 KBNot yet available
Contacts
Similar contracts
- INL_RFQ-PR15734902 - TACTICAL GROUND EQUIPMENT BOGDue Aug 17, 2026
- Forklift PurchaseCaliforniaDue Aug 10, 2026
- 38--REELING MACHINE,CABLE,Due Aug 3, 2026
- Walk Behind ForkliftCODue Jul 28, 2026
- 48 LRS Wire Guided VehicleGB-SFKDue Jul 20, 2026
- Purchase Ebara ESR20N-HT multistage dry vacuum pumpDCDue Jul 20, 2026