Fabrication of Industrial Control Panels/ Pump Control Panels (PCP)
- Response deadline
- Jul 16, 2026 Closed
- Date posted
- Jun 26, 2026
- Source
- Open notice
Description
The Washington Suburban Sanitary Commission, MD ("WSSC"), is soliciting sealed responses for Project Title . Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO Response Submission Time on Response Submission Date . Late responses will not be accepted. WSSC is seeking to establish a contract for the fabrication of standard pump control panels based on approved WSSC designs. WSSC has developed a standardized pump control panel configuration for wastewater pumping stations utilizing two (2) or three (3) constant-speed pumps to promote consistency across facilities. The purpose of this contract is to fabricate these standardized panels—along with any additional local control panels required by WSSC—to enhance operational reliability, reduce spare parts inventory, streamline maintenance activities, and simplify operator training through uniform design and functionality. The purpose of this contract is to fabricate standardized control panels and any additional local control panels required by WSSC to ensure consistent equipment configuration across facilities, improve operational reliability, reduce spare parts inventory, streamline maintenance activities, and simplify operator training.
Documents
No documents posted for this opportunity.