Abraham Faw Run Stream Restoration (MWBE Goals)
- Response deadline
- Oct 8, 2026 Due in 29 days
- Date posted
- Sep 8, 2026
- Source
- Open notice
Description
The City of Frederick (City) is seeking bids from qualified vendors to provide construction services for the Abraham Faw Run Stream Restoration project, located in Monocacy Village Park in the City. The project consists of grading, landscaping, and installation of rock sills, riffles/pools, and other stream stabilization measures in the existing Abraham Faw Run east of East Street, along with associated erosion and sediment control measures. Construction stakeout survey controls (only) will be provided by the Owner. Construction Materials Testing and Inspections to be provided by the Contractor. As-Builts shall be provided by the Owner. The permit includes requirements for self-inspection and record keeping - the Contractor SHALL BE responsible for providing the City of Frederick with inspection reports as outlined in the permit.
Documents
No documents posted for this opportunity.