Replace HVAC units (7) at Mashpee Service Unit
- Response deadline
- Aug 12, 2026 Closed
- Date posted
- Aug 8, 2026
- Source
- Open notice
Description
Replace Roof Top Units on Admin Building: Remove the two existing Trane package rooftop units from the 2,400 SF Admin Building. Install a new rooftop unit appropriately sized for the building’s cooling and heating needs. Replace Roof Top Units on Medical Building Remove the two existing Trane package rooftop units from the 2,400 SF Medical Building. Install a new rooftop unit appropriately sized for the building’s cooling and heating needs. Replace Package Vertical Mounted Unit on Admin Building: Remove the existing Bard package unit from the 2,400 SF Dental Building. Install a new vertical mounted packaged unit appropriately sized for the building’s cooling and heating needs. Replace Package Vertical Mounted Units on Dental Building: Remove the two existing Bard package units from the 2,400 SF Dental Building. Install a new vertical mounted packaged unit appropriately sized for the building’s cooling and heating needs.
Classifications
Documents (7)
- Download75H71526R00006 - Amendment 1.pdf.pdf184 KB
- DownloadAttachment 3 - SF-25.pdf.pdf710 KB
- DownloadAttachment 2 - WH 347.pdf.pdf183 KB
- DownloadAttachment 1 - WD 2015-4045.pdf.pdf102 KB
- Download75H71526R00006 - Amendment 2.pdf.pdf270 KB
- Download75H71526R00006.pdf.pdf3.1 MB
- DownloadAttachment 4 - SF-25A.pdf.pdf700 KB
Contacts
Similar contracts
- E21 Prca HVAC ReplacementDue Oct 27, 2026
- Lower Monumental PH HVAC System UpgradeWashingtonDue Oct 5, 2026
- 16292 Steam Boiler ReplacementUtahDue Oct 19, 2026
- Con | Z1Da | Replace or Chillers | 580-23-105 | PresolicitationTexasDue Oct 12, 2026
- Con | Z2Da | Replace Chiller 1 B104 | 580-24-111 | PresolicitationTexasDue Oct 13, 2026
- AOML HVAC and BAS Controls Upgrade ProjectFloridaDue Sep 29, 2026