FY26 Boiler Inspections
- Response deadline
- Sep 2, 2026 Closed
- Date posted
- Aug 10, 2026
- Source
- Open notice
Description
Project Scope: The Contractor shall inspect and repair mission-critical equipment at the Hanscom AFB, Massachusetts. This includes four (4) boiler units, one (1) Heat Recovery Steam Generator (HRSG), and all associated systems such as the condensate receiver tank, compressors, compressed air tanks, DA tanks, pumps, economizers, fans, the fuel train, turbines, and safety valves. The primary objective is to identify and correct deficiencies to prevent system failures. - Please see Performance Work Statement (PWS) for additional requirements. - Questions are due no later than 2:00PM EST, 26 Aug 2026. Answers will be provided no later than 28 Aug 2026. - Offers are due on or before 11:00AM EST, 2 Sep 2026. - A site visit will be held on 9:00-11:00AM, 25 Aug 2026. Please arrive by 8:15AM at Hanscom AFB Visitor Center to obtain a pass.
Classifications
Documents (6)
- DownloadFY26 Boiler Inspections (SF1449).pdf.pdf840 KB
- DownloadFY26 Boiler Inspections (SF1449 Cover Letter).pdf.pdf231 KB
- DownloadFY26 Boiler Inspections (Potential Offerors)1 (002).pdf.pdf184 KB
- DownloadFY26 Boiler Inspections (PWS).pdf.pdf280 KB
- DownloadFY26 Boiler Inspections (Bid Schedule).xlsx.xlsx27 KB
- DownloadFY26 Boiler Inspections (Wage Determination)_June 2026.pdf.pdf54 KB
Contacts
- anthony.coit@us.af.mil380-456-0773
- luis.cruz.8@us.af.mil380-456-3716
Similar contracts
- AOML HVAC and BAS Controls Upgrade ProjectFloridaDue Sep 29, 2026
- Replace Pharmacy Compounding Room FloorDue Oct 2, 2026
- VA Palo Alto Boiler Plant ServicesCaliforniaDue Oct 12, 2026
- 657-27-107JC, Replace Select Hot Water Heating SystemMissouriDue Oct 16, 2026
- Testing & Inspecting, Preventative Maintenance (PM), Corrective Repairs, and Service Calls for NTX VA Cogeneration and Boiler Chiller Plant Amendment 0002TexasDue Oct 7, 2026
- Buckley SFB - BDOC Chiller ReplacementColoradoDue Sep 28, 2026