The Army requires One (1) Spectrum Analyzer
- Response deadline
- Sep 24, 2026 Due in 3 days
- Date posted
- Sep 21, 2026
- Source
- Open notice
Description
Disclaimer: This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This acquisition is issued as a Request for Quote (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01 effective 13 March 2026. For purposes of this acquisition, the associated NAICS code is 334515. The small business size standard is 750 employees. Contract Line Item (CLIN) Structure: The following is a list of contract line item number(s) and items, quantities and units of measure, (including option(s), if applicable): CLIN 0001: One (1) Spectrum Analyzer in accordance with the attached salient characteristics to be shipped via FOB Destination to Adelphi), Maryland 20783. Specifications/Requirement: Please reference the attached document titled “salient characteristics” Delivery: Delivery is required no later than (NLT) eight (8) weeks after contract award (ACA). Delivery shall be made at 2800 Powder Mill Road, Bldg. 102, Adelphi, MD 20783. Acceptance shall be performed at 2800 Powder Mill Road, Bldg. 102, Adelphi, MD 20783. The FOB point is FOB Destination.
Classifications
Documents (3)
- Salient Characteristics (Final) Redacted.pdf.pdf70 KBNot yet available
- Adelphi List of Local Instructions.pdf.pdf597 KBNot yet available
- Combination Synopsis-Solicitation for Commercial Purchases (Under SAT) (Final).pdf.pdf188 KBNot yet available
Contacts
Similar contracts
- https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=c1a9c92dadcd42c58232b5898ae27c02Due Oct 6, 2026
- Meter, Audio LevelDue Oct 6, 2026
- Fiber Optic Measurement SystemDue Sep 30, 2026
- Lead Set, TestDue Oct 6, 2026
- Meter, Special ScaleDue Oct 6, 2026
- Meter, Special ScaleDue Oct 6, 2026