SLEEVE, BEARING
- Response deadline
- Aug 24, 2026 Due in 5 days
- Date posted
- Aug 19, 2026
- Source
- Open notice
Description
QUOTE REQUEST# 70Z08526N40034B00 SPECIAL NOTICE**PLEASE READ: It is the Government’s belief that only the OEM, DURAMAX MARINE, LLC, CAGE CODE 1PNP7, or their authorized distributors, can obtain the required technical and engineering data and genuine OEM parts required to successfully provide these items. Authorized distributors who have business concerns and the required capabilities to provide these items are invited to submit a quote. If you submit a quote for this solicitation, IT MUST include a letter from the OEM, DURAMAX MARINE, LLC, CAGE CODE 1PNP7, verifying your company is an authorized distributor. The United States Coast Guard Surface Forces Logistics Center has a requirement for the following items: NO SUBSTITUTIONS WILL BE AUTHORIZED WITHOUT APPROVAL FROM USCG SFLC TECHNICAL EXPERTS. COMPLETE STERN TUBE BEARING ASSEMBLY USED IN STERN TUBE ONBOARD 140FT WTGB. REQUIRES A QA INSPECTION AS MSCP. INDIVIDUAL PACKAGE EACH IN ACCORDANCE WITH MIL-STD-2073-1E METHOD 10, IN A WOODEN CRATE, WITH CUSHIONING MATERIALS, DUNNAGE, BLOCKING AND BRACING SHALL BE APPLIED AS REQUIRED TO PROTECT THE ITEMS AND THE ENCLOSED MEDIA AND RESTRICT THE MO VEMENT OF THE ITEM WITHIN THE CONTAINER. EACH PACKAGE IS TO BE MARKED IAW MIL-STD-129R AND BAR CODED IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY. PACKAGE LABEL: ITEM NAME: PART NUMBER: NSN: QNTY: (EXAMPLE 1 EA) COND-A CONTRACT NUMBER / ORDER NUMBER FOR TECHNICAL INQUIRIES: POC: BRADY MYERS EQUIPMENT SPECIALIST E-MAIL: BRADY.A.MYERS@USCG.MIL PH: 571-613-3388 LINE ITEM 1 NSN: 3120-01-082-2885 DESCRIPTION: BEARING, SLEEVE QUANTITY: 1 EA MFG NAME: JOHNSON RUBBER CO. PART_NBR: 14280
Classifications
Documents (1)
- FAR Clauses.docx.docx87 KBNot yet available
Contacts
Similar contracts
- TURBOCHARGER,EXHAUSDue Sep 21, 2026
- ARFF P23 Detroit Diesel 8V92T EngineSouth CarolinaDue Aug 20, 2026
- 28--VALVE,EXHAUST,LEFTDue Aug 31, 2026
- 48--VALVE,REGULATING,SYSTEDue Sep 3, 2026
- 29--PARTS KIT,FUEL INJEDue Aug 31, 2026
- 66--GAGE,PRESSURE,DIALDue Aug 27, 2026