F/A-18E/F and EA-18G Non-Recurring Engineering (NRE) for Zn/Ni Conformal Anodes
- Response deadline
- Sep 25, 2026 Due in 16 days
- Date posted
- Sep 10, 2026
- Source
- Open notice
Description
The F/A-18E/F and EA-18G Program Office (PMA-265) intends to issue a firm fixed price competitive solicitation for non-recurring engineering (NRE) for F/A-18E/F and EA-18G Nose Landing Gear (NLG) and Main Landing Gear (MLG) Conformal Anodes to facilitate the transition from legacy Cadmium (CAD) plating to Low Hydrogen Embrittlement (LHE) Zinc/Nickel (Zn/Ni) plating. Under this effort, the Contractor will design, develop, fabricate, and deliver conformal anodes, associated technical drawings, and anode cases for Zn/Ni plating for the specified landing gear components. The Contractor will be responsible for performing first article inspection (FAI) in conjunction with the existing landing gear overhaul line and confirm, through current density analysis reports, adequate thickness and uniformity of Zn/Ni plating. In addition, the Contractor will also be required to provide the necessary updates to the Technical Data Package to support the transition to Zn/Ni. THIS IS PRE-SOLICITATION SYNOPSIS IS FOR INFORMATIONAL PURPOSES ONLY. THIS DOES NOT CONSTITUTE A REQUEST FOR PROPOSAL (RFP), INVITATION FOR BID (IFB), OR REQUEST FOR QUOTE (RFQ), NOR DOES IT COMMIT THE GOVERNMENT TO CONTRACT FOR ANY SUPPLY OR SERVICE WHATSOEVER. The Government is not seeking proposals at this time. The Government will not reimburse any costs associated with reviewing this notice or responding to any future solicitation. Not responding to this presolicitation synopsis does not preclude participation in any future solicitation, if and when issued. A formal solicitation will be released on the Government-wide Point of Entry (GPE) at SAM.gov at a future date.
Classifications
Documents
No documents posted for this opportunity.
Contacts
Similar contracts
- Actuator, Mechanical, in Repair/Modification ofDue Oct 13, 2026
- Motor Driven TurboDue Sep 10, 2026
- Control Panel, AircrDue Dec 9, 2026
- Support, Cplg, Sgl, AiDue Sep 28, 2026
- Nrp, Fwd Fairing AssDue Oct 13, 2026
- Tanker Kit, Aircraft ReDue Sep 21, 2026