Boiler Inspection and Repairs
- Response deadline
- Sep 11, 2026 Due in 2 days
- Date posted
- Sep 9, 2026
- Source
- Open notice
Description
The Contractor shall perform a comprehensive inspection of all 13 gas boilers and calibrate the associated gas sensors. The Contractor must troubleshoot any conditions found that affect the proper operation of the boilers. Bidders are responsible for verifying all site conditions and quantities prior to bid submission. The Contractor shall provide a complete inspection and troubleshooting service, which includes: Submitting a detailed assessment checklist noting all deficiencies. Providing a line-item cost estimate to correct any identified deficiencies. Ensuring the inspection covers, at a minimum: Mounting, Isolators, and Filter Components Burner and Gas Train Breeching and Combustion Air Boiler Inspection and Chemical Treatment Fan functionality Sight Glass, Water Piping, Gas Piping, and associated valves Electrical connections, including disconnect switch and safety circuits Control systems, firing sequences, and interlocks Safety controls, flame safeguards, and low water cutout Pressure and temperature gauges Testing of the safety relief valve Calibrating all gas sensors and ensuring they communicate correctly with the Building Automation System (BAS).
Classifications
Documents (7)
- 26OCH9006-1 SOW Boilers Revised.pdf.pdf199 KBNot yet available
- Amendment 03 Questions.pdf.pdf114 KBNot yet available
- Boiler Inventory 9-2-2026.pdf.pdf62 KBNot yet available
- Site Visit Sign in sheet.pdf.pdf445 KBNot yet available
- Amendment 04 Site Visit Questions.pdf.pdf54 KBNot yet available
- Boiler RFQ.pdf.pdf124 KBNot yet available
- Wage Determination 15-4281.txt.txt44 KBNot yet available
Contacts
Similar contracts
- Modification for PO 70B03C22P00000508Puerto RicoDue Sep 11, 2026
- Condensate Pump ReplacementsCTDue Sep 14, 2026
- HVAC PREVENTIVE MAINTENANCE AND REPAIR Hampton VA Medical CenterDue Sep 15, 2026
- Acquisition of Fan Coil UnitsAşgabatDue Sep 16, 2026
- H--Fire Sprinkler InspectionDue Sep 16, 2026
- Missoula Technical Development Center installation of HVAC systemMontanaDue Sep 23, 2026