MEARNG F550 Emergency Light Installation
- Response deadline
- Sep 16, 2026 Due in 26 days
- Date posted
- Aug 21, 2026
- Source
- Open notice
Description
The Maine Army National Guard (MEARNG) requires the professional installation of a complete, government-furnished, emergency response vehicle police-style flashing light system and a battery charging system onto a Government-owned Ford F-550 Vehicle Mounted Radiation Detection System (VMRDS). The contractor shall provide all necessary personnel, tools, materials (excluding specified government-furnished equipment), and expertise to complete the installation. Scope of Work: The contractor is required to perform the following installations and integrations on the Ford F-550 vehicle: Equipment Installation: Install all Government-Furnished Equipment (GFE) at specified locations. This includes a Whelen Inner Edge light assembly, a Whelen Core and Controller unit, and various Whelen body, slim, and trio lights. System Integration: Professionally integrate all lighting components with the central controller. All wiring must be routed, secured, protected with grommets where necessary, and concealed appropriately. Power System Installation: Install one Kussmaul battery tender complete with an auto-eject shore power connection to charge the vehicle's batteries. Functional Testing: Conduct a full functional test of the integrated lighting system and the power system in the presence of a Government representative to demonstrate proper functionality. Vehicle Restoration: Upon completion, repair any damage to the vehicle resulting from installation activities and ensure all work areas are cleaned of debris, materials, and tools. Government Furnished Equipment (GFE): The Government will provide the following major components for installation: One (1) Whelen Inner Edge light assembly One (1) Whelen Core and Controller unit Two (2) Whelen slim lights (for front grill) Eight (8) Whelen body lights Two (2) Whelen trio lights Two (2) Whelen slim lights (for front fenders) One (1) Kussmaul battery tender Contractor Requirements: Provide all personnel, equipment, tools, materials (except GFE), and supervision. Ensure all employees possess the required skillsets or licensing to install the lighting system according to manufacturer specifications. The place of performance will be the contractor's installation facility. The period of performance for the installation shall not exceed one week. Period of Performance: The work must be completed within one (1) week from the start date. Questions: May be submitted to the points of contact below. The due date for questions is 09SEP2026. Submission Instructions: All quotes must be submitted via email to the Contract Specialist, Thomas J. Ryan, at thomas.j.ryan36.civ@army.mil and the Contracting Officer, Darlene Howes, at darlene.r.howes.civ@army.mil. Quotes must include a completed SF 1449 and a separate Technical Proposal responding to the evaluation criteria outlined in the FAR 52.212-1 and 52.212-2 Addenda.
Classifications
Documents (3)
- WD 2015-4009 - REV 34 - 25JUN2026.txt.txt47 KBNot yet available
- Solicitation - W912JD26QA025.pdf.pdf3.1 MBNot yet available
- MEARNG CST F550 Emergency Light Installation - PWS.docx.docx56 KBNot yet available
Contacts
- thomas.j.ryan36.civ@army.mil2074305297
- darlene.r.howes.civ@army.mil2074305608
Similar contracts
- 233RD KENWORTH T800 SEMI TRACTOR REPAIRSColoradoDue Sep 4, 2026
- PURCHASE AND INSTALL OF MULTIPLE COMPONENTS ON A 2026 FORD F-350ColoradoDue Sep 1, 2026
- 316 CES Apparatus Performance TestingMarylandDue Aug 14, 2026
- K-9 Transport SystemWashingtonDue Sep 2, 2026
- 6049 Motor Vehicle Accident (MVA) Repairs Anaconda JCCMontanaDue Aug 28, 2026
- Crash 15 Power DividerGeorgiaDue Aug 13, 2026