402-23-794 Modernize Campus Corridors
- Response deadline
- Sep 8, 2026 Due in 12 days
- Date posted
- Aug 27, 2026
- Source
- Open notice
Description
This requirement is set aside and ONLY for the VISN1 Construction MATOC IDIQ Pool The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Veterans Integrated Service Network 1 (VISN1) anticipates awarding a VISN 1 Construction MATOC Task Order for 402-23-794 Mdernize Campus Corridors project. Project Description: The project involves a 15,600-square-foot interior renovation of the Main Street Corridor connecting Buildings B209 and B221 at the Togus VA Medical Center in Augusta, Maine. The project includes comprehensive site preparation, demolition, and construction activities to modernize the campus corridors at the Togus VA Medical Center. Work consists of replacing flooring, roofing, interior finishes, and improving HVAC systems in occupied buildings while maintaining uninterrupted medical center operations. The contractor is responsible for developing VA‑compliant phasing, life safety, security, environmental protection, and utility‑interruption plans. The effort includes strict protection of existing facilities, coordination of temporary utilities, secure document handling, adherence to safety and infection control requirements, and full restoration of affected areas. All work must be performed in accordance with the drawings, specifications, VA safety standards, and federal regulations to deliver a fully compliant, operationally safe, and modernized corridor system. Amendment 0001 added 8/21/2026 Amendment 0002 added 8/25/2026 Amendment 0003 added 8/26/2026 Amendment 0004 added 8/27/2026
Classifications
Documents (19)
- 402-23-794 - Final Specifications.pdf.pdf9.4 MBNot yet available
- 36C24126R0120 0001.docx.docx27 KBNot yet available
- 402-23-794 - ICRA.pdf.pdf71 KBNot yet available
- ME20260009 WR Determination.pdf.pdf1.5 MBNot yet available
- 36C24126R0120 0003.docx.docx32 KBNot yet available
- 36C24126R0120.docx.docx35 KBNot yet available
- 36C24126R0120 0002.docx.docx26 KBNot yet available
- Sign in sheet - Site Visit.pdf.pdf217 KBNot yet available
- SOW Attachment - Security Badge form.pdf.pdf306 KBNot yet available
- 230534 111324 Asbestos Spot Survey PDF.pdf.pdf3.3 MBNot yet available
- Itemized Cost Breakdown.xlsx.xlsx28 KBNot yet available
- Construction SOW.pdf.pdf193 KBNot yet available
- SOW Attachment - Seasonal Influenza with Vaccines.pdf.pdf1.9 MBNot yet available
- 402-23-794 - PCRA.pdf.pdf63 KBNot yet available
- Statement of Items.docx.docx15 KBNot yet available
- 21 13 13 - WET-PIPE SPRINKLER SYSTEMS.pdf.pdf77 KBNot yet available
- SOW Attachment - Togus Campus Map.pdf.pdf255 KBNot yet available
- 36C24126R0120 0004.docx.docx22 KBNot yet available
- 402-23-794 - Final Bid Drawings.pdf.pdf41.7 MBNot yet available
Contacts
- Contract Specialistalexandru.sava@va.gov860-666-6951 x2229
Similar contracts
- IDIQ DESIGN/BUILD, DESIGN BID/BUILD MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) TO PROVIDE CONSTRUCTION SERVICES FOR OPERATIONS AND MAINTENANCE (OPERATIONS AND MAINTENANCE) FOR CIVIL AND MILITARY PROJECTS WITHIN THE GREAT LAKES AND OHIO RIVER DIVISION MISSDue Sep 11, 2026
- Repair Punta Borinquen Lighthouse at USCG Base Borinquen, Aguadilla, Puerto Rico (PNUM 2993811)Puerto RicoDue Sep 11, 2026
- Replace Switchgears at FRCE, Phase 1North CarolinaDue Sep 10, 2026
- CHANCERY BATHROOM MODERNIZATIONBogotáDue Sep 1, 2026
- FPL B49 Fire Hydrant ReplacementWisconsinDue Sep 10, 2026
- Matsushima JASDF Base Storage ShelterMiyagiDue Sep 16, 2026