Replace HVAC units (7) at Mashpee Service Unit
- Response deadline
- Aug 12, 2026 Due in 26 days
- Date posted
- Jul 13, 2026
- Source
- Open notice
Description
Replace Roof Top Units on Admin Building: Remove the two existing Trane package rooftop units from the 2,400 SF Admin Building. Install a new rooftop unit appropriately sized for the building’s cooling and heating needs. Replace Roof Top Units on Medical Building Remove the two existing Trane package rooftop units from the 2,400 SF Medical Building. Install a new rooftop unit appropriately sized for the building’s cooling and heating needs. Replace Package Vertical Mounted Unit on Admin Building: Remove the existing Bard package unit from the 2,400 SF Dental Building. Install a new vertical mounted packaged unit appropriately sized for the building’s cooling and heating needs. Replace Package Vertical Mounted Units on Dental Building: Remove the two existing Bard package units from the 2,400 SF Dental Building. Install a new vertical mounted packaged unit appropriately sized for the building’s cooling and heating needs.
Classifications
Documents (5)
- Attachment 3 - SF-25.pdf.pdf710 KBNot yet available
- Attachment 2 - WH 347.pdf.pdf183 KBNot yet available
- Attachment 1 - WD 2015-4045.pdf.pdf102 KBNot yet available
- 75H71526R00006.pdf.pdf2.9 MBNot yet available
- Attachment 4 - SF-25A.pdf.pdf700 KBNot yet available
Contacts
- Andrew Rhoades