Replace HVAC units (7) at Mashpee Service Unit
- Response deadline
- Aug 12, 2026 Closed
- Date posted
- Jul 13, 2026
- Source
- Open notice
Description
Replace Roof Top Units on Admin Building: Remove the two existing Trane package rooftop units from the 2,400 SF Admin Building. Install a new rooftop unit appropriately sized for the building’s cooling and heating needs. Replace Roof Top Units on Medical Building Remove the two existing Trane package rooftop units from the 2,400 SF Medical Building. Install a new rooftop unit appropriately sized for the building’s cooling and heating needs. Replace Package Vertical Mounted Unit on Admin Building: Remove the existing Bard package unit from the 2,400 SF Dental Building. Install a new vertical mounted packaged unit appropriately sized for the building’s cooling and heating needs. Replace Package Vertical Mounted Units on Dental Building: Remove the two existing Bard package units from the 2,400 SF Dental Building. Install a new vertical mounted packaged unit appropriately sized for the building’s cooling and heating needs.
Classifications
Documents (5)
- Attachment 3 - SF-25.pdf.pdf710 KBNot yet available
- Attachment 2 - WH 347.pdf.pdf183 KBNot yet available
- Attachment 1 - WD 2015-4045.pdf.pdf102 KBNot yet available
- 75H71526R00006.pdf.pdf2.9 MBNot yet available
- Attachment 4 - SF-25A.pdf.pdf700 KBNot yet available
Contacts
Similar contracts
- Modification for PO 70B03C22P00000508Puerto RicoDue Sep 11, 2026
- HVAC PREVENTIVE MAINTENANCE AND REPAIR Hampton VA Medical CenterDue Sep 15, 2026
- Boiler Inspection and RepairsMarylandDue Sep 11, 2026
- Acquisition of Fan Coil UnitsAşgabatDue Sep 16, 2026
- Missoula Technical Development Center installation of HVAC systemMontanaDue Sep 23, 2026
- Condensate Pump ReplacementsCTDue Sep 14, 2026