Replace HVAC units (7) at Mashpee Service Unit
- Response deadline
- Aug 12, 2026 Closed
- Date posted
- Jul 13, 2026
- Source
- Open notice
Description
Replace Roof Top Units on Admin Building: Remove the two existing Trane package rooftop units from the 2,400 SF Admin Building. Install a new rooftop unit appropriately sized for the building’s cooling and heating needs. Replace Roof Top Units on Medical Building Remove the two existing Trane package rooftop units from the 2,400 SF Medical Building. Install a new rooftop unit appropriately sized for the building’s cooling and heating needs. Replace Package Vertical Mounted Unit on Admin Building: Remove the existing Bard package unit from the 2,400 SF Dental Building. Install a new vertical mounted packaged unit appropriately sized for the building’s cooling and heating needs. Replace Package Vertical Mounted Units on Dental Building: Remove the two existing Bard package units from the 2,400 SF Dental Building. Install a new vertical mounted packaged unit appropriately sized for the building’s cooling and heating needs.
Classifications
Documents (5)
- Attachment 3 - SF-25.pdf.pdf710 KBNot yet available
- Attachment 2 - WH 347.pdf.pdf183 KBNot yet available
- Attachment 1 - WD 2015-4045.pdf.pdf102 KBNot yet available
- 75H71526R00006.pdf.pdf2.9 MBNot yet available
- Attachment 4 - SF-25A.pdf.pdf700 KBNot yet available
Contacts
Similar contracts
- Turn Key Chiller Equipment (Purchase and Install)LouisianaDue Nov 30, 2026
- Replacement of 10 Ton HVAC Unit, Bldg.11, PR ANGPuerto RicoDue Nov 3, 2026
- USCG Station Lake Worth Inlet HVAC Diagnostic and RepairsFloridaDue Nov 12, 2026
- El Paso Lift Station Piping RepairDue Oct 27, 2026
- Watervliet Arsenal (WVA) Replacement of the 300 Line Chrome PipingDue Oct 29, 2026
- FY27 Danville Mechanical MATOC SEED PROJECT NO: 550-26-106, Replace Air Handling Unit B58 at the VA Illiana Health Care System (VIHCS), Danville ILDue Dec 15, 2026