Building 623 Drop Ceiling Grid System Replacement - Devens, MA
- Response deadline
- Aug 4, 2026 Due in 9 days
- Date posted
- Jul 26, 2026
- Source
- Open notice
Description
AMENDMENT 0001 - The purpose of Amendment 0001 to Solicitation W15QKN-26-Q-A141 is the following: 1.) To revise the point-of-contact information for the Requiring Activity from Mr. Paul Lavoie (Engineer, Devens Reserve Forces Training Area) to Mr. Zygmunt Osiecki (DPW Director, Devens Reserve Forces Training Area, e-mail: zygmunt.v.osiecki.civ@army.mil ) and 2.) To add the available site-visit dates/time as: Tuesday, 28 JULY 2026 at 8:00am (EST) or Friday, 31 JULY 2026 at 8:00am (EST). The U.S. Army Contracting Command - New Jersey has a new construction requirement in support of the U.S. Army Garrison - Devens RFTA for the removal and reinstallation of a new drop-ceiling grid system and tiles located at Devens RFTA Building 623, Hall of Flags Conference Center, 42 Quebec Street, Devens, MA 01434. The Contractor shall provide all plant, labor, equipment, tools, materials, supervision, incidentals, and services required to perform and complete the work necessary to fully remove and reinstall a new drop ceiling grid system and tiles. Please see the attached Performance Work Statement (PWS) and Solicitation document.
Classifications
Documents (8)
- Attachment 0004 Payment Bond.pdf.pdf777 KBNot yet available
- Solicitation Amendment W15QKN26QA1410001 SF 30.pdf.pdf3.9 MBNot yet available
- Attachment 0002 Construction Cost Breakdown.xls.xls58 KBNot yet available
- Attachment 0003 Bid Bond.pdf.pdf910 KBNot yet available
- Attachment 0005 Performance Bond.pdf.pdf870 KBNot yet available
- Solicitation - W15QKN26QA141.pdf.pdf6.3 MBNot yet available
- Attachment 0006 DBA MA20260004 18 May 2026.pdf.pdf53 KBNot yet available
- Attachment 0001 - Performance Work Statement.pdf.pdf2.1 MBNot yet available
Contacts
Similar contracts
- Y1DA--Project No. 539-25-508 Correct Imaging Tower DeficienciesDue Aug 10, 2026
- REPAIR COOLING TOWERS AND VRF SYSTEM, P-12410, P-12412, CP HUMPHREYS.Due Aug 6, 2026
- 1771 Roofing ReplacementNCDue Aug 26, 2026
- Restroom Repair (MOF)OKDue Aug 4, 2026
- RFQ 19KU2026Q0013 - AEWA Door & Tile Installation Upgrade projectDue Aug 16, 2026
- Matsushima JASDF Base Storage ShelterJP-04Due Aug 7, 2026