66 ABG/SC Giant Voice RTU Relocation
- Response deadline
- Aug 10, 2026 Closed
- Date posted
- Jul 21, 2026
- Source
- Open notice
Description
Relocate one (1) Giant Voice (GV) Remote Terminal Unit (RTU) from the 3rd floor of building 1108. This RTU is one of six RTUs that are part of the base-wide ATI Mass Alert system, which is controlled by two Central Control Units (REACT 5000s). The Contractor shall provide all specialized labor, materials, tools, equipment, and supervision required to safely power down, physically transport, re-install, and re-integrate the system. The objective is to ensure the RTU is restored to Full Operational Capability (FOC) in the new location. This includes the proper handling of all associated radio frequency (RF) cabling, network connections, power configurations, and grounding systems, as well as conducting comprehensive post-move testing and optimization to verify system integrity. NOTE: (Amended) A site visit is scheduled for 30 July 2026 at 9:00am EST at Hanscom AFB, MA. You MUST register prior to attending. Registration to attend the site vist must be provided to kennethea.berry.1@us.af.mil and anthony.coit@us.af.mil, no later than, Tuesday 28 July 2026 at 9:00am, see attached for registration form. Attendance at the site visit is mandatory for a quote to be considered technically acceptable. A physical site survey is critical for this effort. The vendor must personally inspect both the current and future locations of the unit to evaluate the existing infrastructure. Additionally, the vendor must take precise physical measurements for cable lengths and directly assess the available power utilities to ensure technical feasibility.
Classifications
Documents (5)
- Site_Visit_Registration_Form_Giant_Voice.xlsx.xlsx21 KBNot yet available
- Solicitation Amendment FA283526Q00200001 SF 30.pdf.pdf399 KBNot yet available
- Solicitation_FA283526Q0020.pdf.pdf475 KBNot yet available
- Wage Determination Middlesex County June 2026.pdf.pdf4.4 MBNot yet available
- 1-Giant Voice RTU Relocation - PWS - 14 July 2026_Redacted.pdf.pdf466 KBNot yet available
Contacts
Similar contracts
- Uninterruptible Power Supply St. Louis VA Medical CenterDue Oct 6, 2026
- Oxford PlasmaLab 100 tool PLC upgrade or its EquivalentNew YorkDue Oct 13, 2026
- Repair/Overhaul of Flat Panel Up Front Controller (FPUFC)GeorgiaDue Nov 25, 2026
- Steris Service Contract | RFQ | 11/01/26-10/31/31MarylandDue Oct 12, 2026
- Isokinetic Probe and WCM2000 Probe Repair and MaintenanceOhioDue Oct 1, 2026
- STX Advanced Instrument OSMO ServiceDue Oct 9, 2026