Air Curtain Refrigerator and Cold Food Counter_Brand Name or Equal_100% SDVOSB SET-ASIDE
- Response deadline
- Aug 13, 2026 Closed
- Date posted
- Aug 11, 2026
- Source
- Open notice
Description
Vendor Questions and Answers Question 1: Please confirm whether the contractor is responsible for unloading, unpacking, moving the equipment to its final location, assembling the shelves and accessories, plugging in the units, completing startup, and performing temperature testing, or whether any of these activities will be handled by VA personnel. Answer: Yes. The contractor is responsible for unloading, unpacking, transporting the equipment to its final location, assembling shelves and accessories, plugging in the units, completing startup, and performing temperature testing. Question 2: Please confirm whether the required electrical outlets and connections are already installed and ready for use. If electrical modifications, new receptacles, circuits, hardwiring, or electrician services are required, please specify the work the contractor must include. Answer: Yes, standard 110 volt electrical outlets are available. If equipment requires a different electrical configuration, a new electrical outlet and connection will be needed.
Classifications
Documents (3)
Contacts
- Contract Specialistjanice.jones@va.gov860-666-6951 ext. 6613
Similar contracts
- Hepa FilterDue Oct 8, 2026
- Environmental ControlDue Oct 13, 2026
- Compressor Unit, Ref, in Repair/Modification ofDue Oct 29, 2026
- Environmental Control System (ECS)PennsylvaniaDue Oct 13, 2026
- Environmental Control Unit F100-60, Green (NSN 4120016171273) and Environmental Control unit F100-60, Tan (NSN 412001617282)MichiganDue Oct 2, 2026
- Environmental ControlDue Oct 9, 2026