502-21-222 | EHRM Infrastructure Upgrades | Pineville, LA |
- Response deadline
- Oct 14, 2026 Due in 7 days
- Date posted
- Oct 7, 2026
- Source
- Open notice
Description
Amendment 0007 has been posted. Amendment 0007 extends the date for receipt of offers. The new date for receipt of offers is 10/14 at 3PM EDT. Amendment 0007 also provides an update to RFIS and a new basis of design for HVAC units. Amendment 0006 has been posted. Amendment 0006 extends the date for receipt of offers. The new date for receipt of offers is 10/9 at 3PM EDT. Amendment 0006 also excludes the draft schedule from the page limit for Technical Volume I and provides responses to technical questions. Amendment 0005 has been posted. Amendment 0005 extends the date for receipt of offers. The new date for receipt of offers is 10/2 at 3PM EDT. Amendment 0004 has been posted. Amendment 0004 extends the date for receipt of offers. The new date for receipt of offers is 9/18 at 3PM EDT. Amendment 0003 has been posted. Amendment 0003 provides the site visit sign-in sheet and agenda from the 8/20 site visit. Amendment 0002 has been posted. Amendment 0002 provides an updated Attachment 11 - Site Visit Details which includes a campus map. Amendment 0001 has been posted. Amendment 0001 Provides updated Volume 2 drawings and renumbers attachments. The scope of this project includes, but is not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes) cabling and rack/cabinet work for Data Center (relocation of racks/cabinets, cable management), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project building locations include: Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 13, 14, 15, 16, 45, 46, 49, 136, 142, 147, 171, Jennings M.H. CBOC, and the Fort Polk CBOC. The Jennings CBOC, Lafayette CBOC, Lafayette Campus B CBOC, and the Natchitoches CBOC are also included in the scope.
Classifications
Documents (25)
- Amendment 0007.pdf.pdf86 KBNot yet available
- ME_SUBMITTAL_PKA-AK36NL_PUZ-AK36NL_6PSmo.pdf.pdf4.1 MBNot yet available
- Attachment 4 - Vol 3 Drawings.pdf.pdf12.4 MBNot yet available
- Amendment 0001.pdf.pdf85 KBNot yet available
- Amendment 0005.pdf.pdf85 KBNot yet available
- Attachment 7 - Key Subcontractor Information.docx.docx98 KBNot yet available
- RFI Update 10-7-26.pdf.pdf115 KBNot yet available
- Amendment 0004.pdf.pdf85 KBNot yet available
- Attachment 8 - Key Personnel.docx.docx101 KBNot yet available
- Attachment 2 - Vol 1 Drawings.pdf.pdf14.9 MBNot yet available
- Amendment 0003.pdf.pdf83 KBNot yet available
- 36C77626R0104.pdf.pdf610 KBNot yet available
- Site Visit Agenda.pdf.pdf128 KBNot yet available
- RFI Responses.pdf.pdf448 KBNot yet available
- Attachment 5 - Vol 4 Drawings.pdf.pdf14.5 MBNot yet available
- Attachment 3 - Volume 2 Drawings.pdf.pdf41.4 MBNot yet available
- Attachment 9 - Division Pricing Template.xlsx.xlsx10 KBNot yet available
- Attachment 1 - Specifications.pdf.pdf23.1 MBNot yet available
- ME_SUBMITTAL_PKA-AK24NL_PUZ-AH24NL_XbtyE.pdf.pdf3.8 MBNot yet available
- Amendment 0006.pdf.pdf86 KBNot yet available
- Attachment 11 - Site Visit Details.docx.docx80 KBNot yet available
- Site Visit Sign In Sheet 8-20-26.pdf.pdf1.8 MBNot yet available
- Attachment 6 - Limitations on Subcontracting - Construction.docx.docx28 KBNot yet available
- Amendment 0002.pdf.pdf83 KBNot yet available
- Attachment 10 - Wage Determination.pdf.pdf37 KBNot yet available
Contacts
- Contract Specialistandrew.mathews2@va.gov216-447-8300
Similar contracts
- Request for Proposal (RFP) N4008427R1027 - Fy27 Special Project U.S. Naval Hospital Alteration, Commander Fleet Activities Yokosuka, JapanDue Dec 8, 2026
- REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIOOhioDue Oct 22, 2026
- Callao, Peru Infrastructure Modernization - U.S. Army Corps of Engineers (USACE) – Latin America and Caribbean District (SAA)Due Nov 16, 2026
- Trade and Cargo AcademySouth CarolinaDue Oct 13, 2026
- Expand 111 OR Department 2AS Phase 1 - Construction - Milwaukee, WI - Project:695-501WisconsinDue Nov 10, 2026
- Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TXTexasDue Oct 22, 2026