502-21-222 | EHRM Infrastructure Upgrades | Pineville, LA |
- Response deadline
- Oct 9, 2026 Due in 15 days
- Date posted
- Sep 24, 2026
- Source
- Open notice
Description
Amendment 0006 has been posted. Amendment 0006 extends the date for receipt of offers. The new date for receipt of offers is 10/9 at 3PM EDT. Amendment 0006 also excludes the draft schedule from the page limit for Technical Volume I and provides responses to technical questions. Amendment 0005 has been posted. Amendment 0005 extends the date for receipt of offers. The new date for receipt of offers is 10/2 at 3PM EDT. Amendment 0004 has been posted. Amendment 0004 extends the date for receipt of offers. The new date for receipt of offers is 9/18 at 3PM EDT. Amendment 0003 has been posted. Amendment 0003 provides the site visit sign-in sheet and agenda from the 8/20 site visit. Amendment 0002 has been posted. Amendment 0002 provides an updated Attachment 11 - Site Visit Details which includes a campus map. Amendment 0001 has been posted. Amendment 0001 Provides updated Volume 2 drawings and renumbers attachments. The scope of this project includes, but is not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes) cabling and rack/cabinet work for Data Center (relocation of racks/cabinets, cable management), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project building locations include: Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 13, 14, 15, 16, 45, 46, 49, 136, 142, 147, 171, Jennings M.H. CBOC, and the Fort Polk CBOC. The Jennings CBOC, Lafayette CBOC, Lafayette Campus B CBOC, and the Natchitoches CBOC are also included in the scope.
Classifications
Documents (21)
- Attachment 4 - Vol 3 Drawings.pdf.pdf12.4 MBNot yet available
- Amendment 0001.pdf.pdf85 KBNot yet available
- Amendment 0005.pdf.pdf85 KBNot yet available
- Attachment 7 - Key Subcontractor Information.docx.docx98 KBNot yet available
- Amendment 0004.pdf.pdf85 KBNot yet available
- Attachment 8 - Key Personnel.docx.docx101 KBNot yet available
- Attachment 2 - Vol 1 Drawings.pdf.pdf14.9 MBNot yet available
- Amendment 0003.pdf.pdf83 KBNot yet available
- 36C77626R0104.pdf.pdf610 KBNot yet available
- Site Visit Agenda.pdf.pdf128 KBNot yet available
- RFI Responses.pdf.pdf448 KBNot yet available
- Attachment 5 - Vol 4 Drawings.pdf.pdf14.5 MBNot yet available
- Attachment 3 - Volume 2 Drawings.pdf.pdf41.4 MBNot yet available
- Attachment 9 - Division Pricing Template.xlsx.xlsx10 KBNot yet available
- Attachment 1 - Specifications.pdf.pdf23.1 MBNot yet available
- Amendment 0006.pdf.pdf86 KBNot yet available
- Attachment 11 - Site Visit Details.docx.docx80 KBNot yet available
- Site Visit Sign In Sheet 8-20-26.pdf.pdf1.8 MBNot yet available
- Attachment 6 - Limitations on Subcontracting - Construction.docx.docx28 KBNot yet available
- Amendment 0002.pdf.pdf83 KBNot yet available
- Attachment 10 - Wage Determination.pdf.pdf37 KBNot yet available
Contacts
- Contract Specialistandrew.mathews2@va.gov216-447-8300
Similar contracts
- PLA Special Notice FY25 Joint Base Lewis McChord Multi Domain Task Force Buildings 3221-3222WashingtonDue Oct 8, 2026
- SHI Replace Lead Glazed Bathtubs at United States Coast Guard Rio Bayamon Housing Base San Juan, Puerto Rico PNUM 24658602Puerto RicoDue Oct 9, 2026
- Correct Fire (Life) Safety Issues (Construction)Due Oct 9, 2026
- Notice to Construction Community: USACE Rock Island District RMS to CMP TransitionIllinoisDue Jun 30, 2027
- HAFB Multiple Award Construction Contract V (MACC V)Due Dec 9, 2026
- Sources Sought Notice Market Research Expand Ambulatory Rehab-ConstructionVirginiaDue Oct 8, 2026