BONNET CARRE SPILLWAY STRUCTURE GRATING SUPPLY CONTRACT St. Charles Parish, LA
- Response deadline
- Sep 18, 2026 Due in 32 days
- Date posted
- Aug 17, 2026
- Source
- Open notice
Description
The contractor shall provide all materials for Bonnet Carre Spillway Structure Grating as outlined in the Bidding Schedule and Material & Requirements Paragraphs. The contractor is responsible for purchasing and delivery of all materials to the Bonnet Carre Spillway's project maintenance yard (16302 River Rd., Norco, LA). a. Furnish 24 foot long (spans) and 20 foot long (spans) of hot dipped galvanized welded bar grating walkway panels in the quantities indicated in the bidding schedule. The galvanized welded bar grating shall be serrated, non-banded with bar dimensions of 1-1/4" x 3/16" (19-W-4). Grating panel widths shall be 27-5/8 inches wide. b. Furnish 1,000 hot dipped galvanized "G-Type" grating clips with adequate depth to secure the 1-1/4" depth grating panels. Submit quotes via email to Leann Thornton; Leann.R.Thornton@usace.army.mil
Classifications
Documents (1)
- Solicitation - W912P826QA032.pdf.pdf3.2 MBNot yet available
Contacts
Similar contracts
- 20200PR260000061 - MODIFICATIONS AND METAL FABRICATION OF TRAINING PLATFORM AT USCG AIR STATION VENTURACaliforniaDue Aug 22, 2026
- 1232SA26Q1017 - Amendment 00001 Combined Synopsis-Solicitation Bison Handling Equipment USDA ARS MWA Ames IAIowaDue Aug 20, 2026
- Procurement of Universal System Scaffold ComponentsMarylandDue Aug 28, 2026
- 45--HEATER,WATER,ELECTRDue Aug 24, 2026
- 45--HEATER,WATER,ELECTRDue Aug 17, 2026
- 1232SA26Q1017 - Combined Synopsis-Solicitation Bison Handling Equipment USDA ARS MWA Ames IAIowaDue Aug 20, 2026