SAM.govW9128F26RA060
Open
Los Alamitos AASF Tank Repair Maintenance
- Response deadline
- Sep 22, 2026 Due in 14 days
- Date posted
- Sep 8, 2026
- Source
- Open notice
Description
*8 September 2026: This amendment publishes a change in the Scope of Work, provides an additional drawing for the temporary tanks, and extends the due date for the proposal to 22 September 2026. ______________________*.....*21 August 2026: This amendment is to extend the due date for the proposal to 4 September 2026 and post the sign in sheet for the Site Visit._________________* This project includes performing repairs and maintenance to one vertical aboveground storage tank at Los Alamitos AFB, in California. The contractor shall phase their work to minimize disruption to existing fuels operations. The repairs and maintenance items shall be performed to comply with API 653 and all applicable design criteria and standards.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
- tony.j.manna@usace.army.mil4029952907
Similar contracts
- Joint Base Langley Eustis Tank RepairsDue Oct 20, 2026
- Containment Sump Replacement - McConnell AFBKansasDue Sep 17, 2026
- NITROGEN-ARGON PIPING INSTALLATION at the Watervliet Arsenal (WVA)New YorkDue Sep 11, 2026
- Freedom Connection Natural Gas PipelinePuerto RicoDue Sep 24, 2026
- FY 26 Roush Lake Diesel Fill Tube ReplacementDue Sep 11, 2026
- Underground Storage Tank Repair/ReplaceWashingtonDue Sep 1, 2026