Tailwater Volunteer Village Campground Construction
- Response deadline
- Aug 13, 2026 Due in 19 days
- Date posted
- Jul 24, 2026
- Source
- Open notice
Description
The contractor shall furnish all materials, supplies, tools, equipment, transportation, labor and supervision necessary to construct a small, two-site campground adjacent to the river corridor. Construction includes site excavation, access road installation and the complete installation of water, electrical and sewage utilities to each campsite. All work must adhere to the project maps provided (Exhibit 1) and the technical specifications detailed below. All materials andworkmanship will be manufactured and accomplished according to industry standards and specifications. NAICS 237990, Other Heavy and Civil Engineering Construction, size standard $45,000,000.00. Disclosure of Magnitude: Between $100,000 and $250,000. This procurement is 100% set-aside for Small Business. The contract award will be based on lowest total price to the Government. All questions pertinent to this RFQ shall be submitted ONLY THROUGH ProjNet per the included instructions.
Classifications
Documents (9)
- Wage Determination.pdf.pdf72 KBNot yet available
- Clauses.pdf.pdf93 KBNot yet available
- Solicitation - W912QR26QA071.pdf.pdf6.2 MBNot yet available
- PROJNET Instructions.pdf.pdf101 KBNot yet available
- REPS AND CERTS.pdf.pdf46 KBNot yet available
- PIEE Directions.pdf.pdf122 KBNot yet available
- attachmentNot yet available
- SPECIAL INSTRUCTIONS.pdf.pdf95 KBNot yet available
- Tailwater Volunteer Village Campground SOW FINAL.pdf.pdf588 KBNot yet available
Contacts
Similar contracts
- FY26 Maintenance Dredging, Military Ocean Terminal Sunny Point (MOTSU)Due Aug 31, 2026
- GAOA Accessible Upgrades Toilet ReplacementCADue Jul 30, 2026
- Tailwater Volunteer Village Campground ConstructionDue Aug 13, 2026
- FY26 Black Rock Lock Damage RepairDue Jul 29, 2026
- Houston Ship Channel Expansion Channel Improvement Project (HSC-ECIP), Segment 4 (Boggy Bayou to Sims Bayou) Dredging and Beltway 8 (BW-8) Placement Area Completion WorkDue Aug 13, 2026
- EAGLE ISLAND CELL 2 IMPROVEMENTSDue Aug 24, 2026