Nolin River Lake Tailwater Restroom Construction
- Response deadline
- Aug 11, 2026 Closed
- Date posted
- Jul 22, 2026
- Source
- Open notice
Description
PROJECT TITLE: NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTIONPROJECT LOCATION: NOLIN RIVER LAKE, KENTUCKYTHE CONTRACTOR WILL FURNISH ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT NECESSARY TO CONSTRUCT A FLUSH RESTROOM FACILITY AT THE TAILWATER RECREATION AREA OF NOLIN RIVER LAKE, KENTUCKY IN ACCORDANCE WITH THESE SPECIFICATIONS AND REQUIREMENTS. THE CONTRACTOR?S WORK AND RESPONSIBILITY WILL INCLUDE ALL PLANNING, PROGRAMMING, MEASUREMENTS AND ESTIMATES OF QUANTITIES, ADMINISTRATION, SUPERVISION, COMMUNICATIONS, AND INSPECTION NECESSARY TO ENSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS. THE PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL SUBCONTRACTORS COMPLY WITH THE PROVISIONS OF THIS CONTRACT. PREVAILING CONSTRUCTION WAGE RATES WILL BE REQUIRED AND SHOULD BE CONSIDERED WITH YOUR QUOTE.36.204 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECT: BETWEEN $100,000.00 AND $250,000.00.THIS PROCUREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 236220, SIZE STANDARD $45,000,000.00.IN LIEU OF BOTH PERFORMANCE AND PAYMENT BONDS, PER RFO 52.228-13 ALTERNATE PAYMENT PROTECTIONS (2000) AND RFO 28.102-1(B), ONLY A PAYMENTBOND OR IRREVOCABLE LETTER OF CREDIT IS REQUIRED.
Classifications
Documents (11)
- REPS AND CERTS.pdf.pdf46 KBNot yet available
- attachmentNot yet available
- PIEE Directions.pdf.pdf122 KBNot yet available
- Wage Determination.pdf.pdf74 KBNot yet available
- Special Instructions.pdf.pdf97 KBNot yet available
- Solicitation - W912QR26QA067.pdf.pdf6.2 MBNot yet available
- Clauses.pdf.pdf57 KBNot yet available
- SOW_NRL_Tailwater Restroom_Final.pdf.pdf882 KBNot yet available
- ProjNet Instructions.pdf.pdf102 KBNot yet available
- APPENDIX B_NRL Tailwater Restroom.pdf.pdf193 KBNot yet available
- Appendix A Plan Sheets (MB 01_PB01_AB01_EN01 and EN02)_ NRL Tailwater Restroom.pdf.pdf1.8 MBNot yet available
Contacts
Similar contracts
- 561-26-103 Upgrade Electrical and Plumbing in Building 18BNew Jersey
- 561-26-103 Upgrade Electrical and Plumbing in Building 18BNew Jersey
- Design Build to Install Parking Shades and Parking Lot Reconfiguration Project 593-26-306NevadaDue Oct 23, 2026
- Fy27 MaccSouth CarolinaDue Oct 28, 2026
- Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NFNew MexicoDue Nov 6, 2026
- 550-20-121 Demo Old Boiler Plant B100 (CON)Due Nov 18, 2026