Y--Boat Ramp Replacement Project at Kirwin NWR
- Response deadline
- Jul 31, 2026 Closed
- Date posted
- Jun 18, 2026
- Source
- Open notice
Description
Project Description: Boat Ramp Project at Kirwin NWR Location: Kirwin NWR (National Wildlife Refuge) 702 E. Xavier Road Kirwin, KS 67644 Interested contractors must be registered in SAM (System for Award Management, www.sam.gov) and complete online representations and certifications before the solicitation response due date. Solicitation is expected to be posted on July 1, 2026. This project will be set aside for small businesses only. Contract Type: Firm-Fixed Price Project Magnitude: Between $500K and $1M Period of Performance: 60 Days After Receipt of NTP Bonds: A bid bond is not required. Contractors are reminded that any amount awarded over $35,000 requires submission of a Payment Bond. Any amount over $150,000.00 requires both payment and performance bonds. Bonds are due no later than 10 calendar days after award. Due to the project magnitude, both payment and performance bonds will be required. Basis for Award: Tradeoff - Best Value
Classifications
Documents (1)
- DownloadA04_Statement_of_Work_Boat_Ramps_0044043673_2.pdf.pdf1.0 MB
Contacts
Similar contracts
- SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR CAPE MAY TO LOWER TOWNSHIP, NEW JERSEY, BRIGANTINE INLET TO GREAT EGG HARBOR INLET (ABSECON ISLAND), NEW JERSEY, AND BARNEGAT INLET TO LITTLE EGG, INLETNew JerseyDue Nov 2, 2026
- Corinth National Cemetery, 838Cm3036 – Gravesite Expansion and Cemetery ImprovementsMississippi
- SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)DelawareDue Nov 2, 2026
- Mill Springs National Cemetery Gravesite ExpansionKentucky
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 18-Inch Diameter), Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging within the Vicksburg DistrictMississippiDue Oct 23, 2026
- Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund SiteDue Nov 20, 2026