MS-220015C Pump Stations 44 & 45 Abandonment
- Response deadline
- Sep 22, 2026 Due in 30 days
- Date posted
- Aug 24, 2026
- Source
- Open notice
Description
Provision of all labor and materials required for the installation of the improvements to the sanitary sewer system with new sewers of approximately 447 LF of 21” PVC, 164 LF of 16” PVC, 2,276 LF of 15” PVC, 171 LF of 10” PVC, 11 EA of 4’ Dia. Manholes, 3 EA of 5’ Dia. Inside Drop Manholes, Rehabilitation of MHs with Epoxy, Temporary Pumping, Dam Evaluation and Restoration, 5 LS of Stream Crossing Restorations and other associated miscellaneous sanitary sewer work. Provision of all labor and materials required for the abandonment of Pump Stations 44 and 45 including removal/salvage of existing equipment; piping; valves; fittings; pavement; structures; miscellaneous features; pipe abandonment; abandonment of 6 EA of air release valve/vaults; abandonment of 8”, 10” and 15’ pipes; and site restoration as defined on the Drawings.
Documents
No documents posted for this opportunity.
Similar contracts
- MS1-00015 Interior Spot Repair and Exterior Overcoat - 1.5 MG Stoneridge Water TowerKSDue Sep 1, 2026
- MS9-W23004 Iowa St Waterline Replacement - 28th Ter to 31st St and 33rd StKSDue Aug 18, 2026
- MS6-M26006 2026 Pavement MarkingsKSDue Aug 4, 2026
- PR5-B25001 YSC-Asphalt Parking Lots ADA accessKSDue Aug 4, 2026
- MS9-L25001 - 15th/Learnard Sanitary Sewer ExtensionKSDue Jul 21, 2026
- MS-200013 Kansas River Wastewater Treatment Plant Roadway ImprovementsKSDue Jul 21, 2026