Civic AI
Civic AI
Procurement intelligence
OpenGov / IonwaveCIFB-2600028
Open

MS-220015C Pump Stations 44 & 45 Abandonment

Response deadline
Sep 22, 2026
Due in 30 days
Date posted
Aug 24, 2026

Description

Provision of all labor and materials required for the installation of the improvements to the sanitary sewer system with new sewers of approximately 447 LF of 21” PVC, 164 LF of 16” PVC, 2,276 LF of 15” PVC, 171 LF of 10” PVC, 11 EA of 4’ Dia. Manholes, 3 EA of 5’ Dia. Inside Drop Manholes, Rehabilitation of MHs with Epoxy, Temporary Pumping, Dam Evaluation and Restoration, 5 LS of Stream Crossing Restorations and other associated miscellaneous sanitary sewer work. Provision of all labor and materials required for the abandonment of Pump Stations 44 and 45 including removal/salvage of existing equipment; piping; valves; fittings; pavement; structures; miscellaneous features; pipe abandonment; abandonment of 6 EA of air release valve/vaults; abandonment of 8”, 10” and 15’ pipes; and site restoration as defined on the Drawings.

Documents

No documents posted for this opportunity.

Similar contracts

Explore more