SAM.gov25P025775
Open
Kingsley Field Fueling System Repairs
- Response deadline
- Oct 29, 2026 Due in 21 days
- Date posted
- Oct 8, 2026
- Source
- Open notice
Description
The scope will include the design and construction to include the demolition of all existing fueling systems. Following demolition, the Contractor will be responsible for designing and constructing new offloads and fillstands with secondary containment, remote containment basin, required asphalt pavement, a pump shelter with snow shields, fencing, receipt piping and ATG installation.
Classifications
- NAICS237120
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Joint Base Langley Eustis Tank RepairsDue Oct 20, 2026
- Mather Fueling System RepairsDue Oct 14, 2026
- DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, JapanDue Jan 25, 2027
- Los Alamitos AASF Tank Repair MaintenanceDue Sep 30, 2026
- Freedom Connection Natural Gas PipelinePuerto RicoDue Oct 8, 2026
- Z--ID-CAMAS NWR- Fuel Tanks WiringDue Oct 8, 2026