Nolin River Lake Tailwater Restroom Construction
- Response deadline
- Sep 21, 2026 Due in 3 days
- Date posted
- Sep 18, 2026
- Source
- Open notice
Description
PROJECT TITLE: NOLIN RIVER LAKE TAILWATER RESTROOM CONSTRUCTIONPROJECT LOCATION: NOLIN RIVER LAKE, KENTUCKYTHE CONTRACTOR WILL FURNISH ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT NECESSARY TO CONSTRUCT A FLUSH RESTROOM FACILITY AT THE TAILWATER RECREATION AREA OF NOLIN RIVER LAKE, KENTUCKY IN ACCORDANCE WITH THESE SPECIFICATIONS AND REQUIREMENTS. THE CONTRACTORS WORK AND RESPONSIBILITY WILL INCLUDE ALL PLANNING, PROGRAMMING, MEASUREMENTS AND ESTIMATES OF QUANTITIES, ADMINISTRATION, SUPERVISION, COMMUNICATIONS, AND INSPECTION NECESSARY TO ENSURE THAT ALL WORK IS CONDUCTED IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS. THE PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING ALL SUBCONTRACTORS COMPLY WITH THE PROVISIONS OF THIS CONTRACT. PREVAILING CONSTRUCTION WAGE RATES WILL BE REQUIRED AND SHOULD BE CONSIDERED WITH YOUR QUOTE. 36.204 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECT: BETWEEN $100,000.00 AND $250,000.00. THIS PROCUREMENT IS 100% SET-ASIDE FOR SMALL BUSINESS UNDER NAICS 236220, SIZE STANDARD $45,000,000.00. IN LIEU OF BOTH PERFORMANCE AND PAYMENT BONDS, PER RFO 52.228-13 ALTERNATE PAYMENT PROTECTIONS (2000) AND RFO 28.102-1(B), ONLY A PAYMENT BOND OR IRREVOCABLE LETTER OF CREDIT IS REQUIRED. INFORMATION REGARDING THE U.S. ARMY CORPS OF ENGINEERS PROCESS FOR SETTLING REQUESTS FOR EQUITABLE ADJUSTMENTS AND DURATION GOALS TO ACHIEVE DEFINITIZATION OF EQUITABLE ADJUSTMENTS FOR CHANGE ORDERS UNDER CONSTRUCTION CONTRACTS CAN BE FOUND BY GOING TO HTTPS: //WWW.USACE.ARMY.MIL/STRATEGIC-PARTNERSHIPS/PARTNERING/MOD/129895/DETAILS/443/ THEN SCROLLING DOWN ON RIGHT HAND SIDE OF PAGE BY CLICKING ON VIEW FFP CONTRACT CHANGES PLAYBOOK HERE. ***Amendment 0001*** This amendment to the solicitation is for the Government to formally post and respond to the questions received in ProjNet. Please see the attached PDF file to view all questions and answers for this project. ProjNet is closed for receiving new questions for this solicitation and no further questions will be accepted by the Government at this time. The offeror due date and time remain unchanged. All offerors must acknowledge this amendment when submitting their quote to be considered a responsive offer. ***Amendment 0001*** ***Amendment 0002*** RFO clause 52.217-3 Evaluation Exclusive of Options was included in the solicitation in error. This amendment is to remove RFO 52.217-3 and replace it with RFO 52.217-4 Evaluation of Options Exercised at Time of Contract Award and RFO 52.217-5 Evaluation of Options. The offeror due date is hereby extended to 21 September 2026 at 10:00 AM EDT. All offerors must acknowledge this amendment when submitting their quote to be considered a responsive offer. ***Amendment 0002***
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Space Port of the Future Infrastructure (SPOTFi) CampusDue Oct 9, 2026
- Z--DENA 332037 Eielson Roof ReplacementDue Oct 15, 2026
- Barrow Observatory Flooring ReplacementAlaskaDue Sep 24, 2026
- Correct Fire (Life) Safety Issues (Construction)Due Sep 25, 2026
- Prequalification of Sources for Construction Services to include Design-Build (DB) and Design Bid-Build (DBB) for the U.S. Army Corps of Engineers (USACE) Honolulu District, Area of Responsibility (AOR), Primarily on Kwajalein Atoll, Republic of the MarshDue Sep 26, 2026
- Design-Build to Budget (DB2B) Tactical Unmanned Aerial Vehicle (TUAV) HangarDue Oct 19, 2026