KC-46 Landing Gear PBL
- Response deadline
- Jul 28, 2026 Due in 11 days
- Date posted
- Mar 23, 2026
- Source
- Open notice
Description
Solicitation SPRHA1-26-R-4646 is for the KC-46 Landing Gear Performance Based Logistics (PBL) program. The purpose of this contract will be to obtain remanufacture and overhaul support for all KC-46 Landing Gear Depot Level Repairables (DLRs) to include shipsets and field level replaceable subcomponents to meet the required programmed Time Change Intervals (TCI) and field level demands. The items associated with this effort are considered commercial products. This PBL will be a requirements-type contract with a 5-year basic period and a 5-year option period. The total contract duration shall not exceed 10 years. There is reasonable expectation that offers will be obtained from at least two responsible small business concerns, therefore this will be a single-award small business set-aside. The RFP is anticipated to be active from February 11, 2026 through July 28, 2026. The required scope and items covered are outlined in the RFP and attachments. 02/10/2026 UPDATE: RFP Q&A Added to Attachments 02/20/2026 UPDATE: Amendment 0001 has been issued to clarify requirements in sections L & M. See SPRHA1-26-R-4646 0001 in attachments. 03/04/2026 UPDATE: Updated RFP Q&A Added to Attachments 03/06/2026 UPDATE: Updated RFP Q&A Added to Attachments 3/23/2026 UPDATE: Amendment 0002 has been issued to further clarify/correct requirements in section L. See SPRHA1-26-R-4646 0002 in Attachments. Updated RFP Q&A has also been added to Attachments.
Classifications
Documents (27)
- DownloadSPRHA1-26-R-4646 0001.pdf.pdf324 KB
- DownloadKC-46 LGPBL - TRD Main.pdf.pdf269 KB
- Download04 - SSLLP Assembly Tracking (Attachment 4).xlsx.xlsx31 KB
- Download14 - KC-46 LG PBL CDRL Listing and Matrix (Contractor) (Attachment 14).xlsx.xlsx22 KB
- Download06 - KC-46 LG TEP - (Attachment 6).xlsx.xlsx77 KB
- Download07 - Past Performance Consent Letter (Attachment 7).docx.docx34 KB
- DownloadKC-46 Landing Gear PBL - RFP QA 3.6.26.pdf.pdf98 KB
- Download02- PMRT Workbook (Attachment 2).xlsx.xlsx104 KB
- DownloadKC-46 LGPBL - APPENDIX B - Performance Metrics Reconciliation.pdf.pdf314 KB
- Download09 - Past Performance Questionnaire (Attachment 9).docx.docx40 KB
- Download10 - Past Performance Information Sheet (Attachment 10).docx.docx40 KB
- Download08 - Past Performance Client Auth Ltr (Attachment 8).docx.docx28 KB
- DownloadKC-46 LGPBL - APPENDIX C - Remanufacturing Requirements.pdf.pdf287 KB
- DownloadKC-46 Landing Gear PBL - RFP QA 3.23.26.pdf.pdf103 KB
- Download01 - KC-46 LG PBL NSN List (Attachment 1).xlsx.xlsx28 KB
- Download03 - SSLLP Disassembly Tracking (Attachment 3).xlsx.xlsx30 KB
- DownloadKC-46 LGPBL CDRL Portfolio.pdf.pdf3.7 MB
- DownloadKC-46 LGPBL - APPENDIX A - Supply Chain and Program Management .pdf.pdf225 KB
- Download13 - GFM and Instructions (Attachment 13).docx.docx56 KB
- Download05 - KC-46 TCI Schedule (Attachment 5).xlsx.xlsx28 KB
- DownloadSPRHA1-26-R-4646.pdf.pdf595 KB
- Download12 - Process Steps For Parts Beyond CMM Repairability (Attachment 12).docx.docx93 KB
- Download11 - Team Roles and Responsibilities (Attachment 11).xlsx.xlsx20 KB
- DownloadKC-46 Landing Gear PBL - RFP QA 2.10.26.pdf.pdf124 KB
- DownloadSPRHA1-26-R-4646 0002.pdf.pdf273 KB
- DownloadKC-46 LGPBL - APPENDIX D - Acronyms Forms and Definitions.pdf.pdf219 KB
- DownloadKC-46 Landing Gear PBL - RFP QA 3.4.26.pdf.pdf91 KB
Contacts
- Kyle Swaner