SAM.gov140R6026R0016
Open
Z--Webster Dam Spillway Radial Gates Repair
INTERIOR, DEPARTMENT OF THE · Kansas
- Response deadline
- Sep 10, 2026 Closed
- Date posted
- Aug 24, 2026
- Source
- Open notice
Description
Webster Dam, Spillway Radial Gates Repair, Webster Unit, Solomon Division, Pick-Sloan Missouri Basin Program, Kansas
Classifications
Documents (11)
- Sol_140R6026R0016.pdf.pdf283 KBNot yet available
- Webster_Site_Visit_Agenda_and_Sign-in_Sheet_0001.pdf.pdf379 KBNot yet available
- Section_J_-_Attachment__3_-_Specifications_7-7-26.pdf.pdf11.8 MBNot yet available
- 41_22_31_-_Refurbishment_of_Spillway_Radial_Gate_Hoists_Revised_8-20-26_0002.pdf.pdf159 KBNot yet available
- Section_J_-_Attachment__4_-_Drawings_7-7-26.pdf.pdf43.3 MBNot yet available
- 09_96_20_-_Coatings_Revised_8-20-26_0002.pdf.pdf141 KBNot yet available
- Sol_140R6026R0016_Amd_0002.pdf.pdf203 KBNot yet available
- Amendment_0002_-__Q_A_-_140R6026R0016_-_Webster_Dam_Spillway_Radial_Gates_Repair__-_Answers_0002.pdf.pdf183 KBNot yet available
- 01_14_20_-_Radial_Gate_Operation_Revised_8-20-26_0002.pdf.pdf666 KBNot yet available
- Updated_Solicitation_Package_-_140R6026R0016_7-20-2026_V3.pdf.pdf3.0 MBNot yet available
- Sol_140R6026R0016_Amd_0001.pdf.pdf202 KBNot yet available
Contacts
- terra_warren@ios.doi.gov0000000000
Similar contracts
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 18-Inch Diameter), Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging within the Vicksburg DistrictMississippiDue Oct 23, 2026
- Jacksonville Harbor Maintenance DredgingDue Dec 31, 2026
- Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund SiteDue Nov 20, 2026
- Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2
- JP Murtha Float Mooring Bitts RetrofitDue Nov 5, 2026
- Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, FloridaDue Oct 23, 2026