SAM.govW91QF4-26-B-A013
Open
Installation Lightning Protection (Insp-Test-Rpr)
DEPT OF DEFENSE · Kansas
- Response deadline
- Sep 17, 2026 Closed
- Date posted
- Sep 14, 2026
- Source
- Open notice
Description
Amendment #0002 - a. Add Question and Answer b. Change CLIN Structure from Months to Job c. Schedule of Values (SOV) allocation of project execution included Section H. d. POP Base Year 30 SEP 2026 - 29 SEP 2027 / OY1 if exercised 30 SEP 2027 - 29 SEP 2028 e. All other terms and conditions remain unchanged.
Classifications
Documents (16)
- 3-SF30_Amednment-0002-All_CLINS_JOB_and_Add_Attch12_QandA.pdf.pdf3.9 MBNot yet available
- Attch-2-Facilities_POC_List-TE-A1.pdf.pdf145 KBNot yet available
- 2-SF30_Amendment-0001-Add_52.217-9_Update_CLIN_0001_and_1001.pdf.pdf3.8 MBNot yet available
- 1-IFB-CONF_COPY-Amend-0001-W91QF426BA013_LPS.pdf.pdf6.3 MBNot yet available
- Attch-7-UL_Lightning_Protection-TE-F.pdf.pdf653 KBNot yet available
- Attch-8-Sample LV-DES-LAC-APPLICATION-TE-G.pdf.pdf419 KBNot yet available
- Attch-9-Sample_Key_Personnel_Roster-TE-H.pdf.pdf663 KBNot yet available
- Attch-1-Facilities_List-TE-A.pdf.pdf91 KBNot yet available
- 0-IFB-W91QF426BA013_Lightning_Protection_System.pdf.pdf7.2 MBNot yet available
- z-Attch-12-QandA_Lightning_Protection.pdf.pdf56 KBNot yet available
- Attch-5-Previous_Completed_Finalized_Building_Reports-TE-D.pdf.pdf5.5 MBNot yet available
- z-Attch-10-iWATCH_Army_Training_for_Contractors-TE-I.pdf.pdf1.6 MBNot yet available
- Attch-6-ufc_3_575_01_2012_c1-TE-E.pdf.pdf1.0 MBNot yet available
- Attch-3-Drawings_and_Test_Results-TE-B.pdf.pdf.pdf26.8 MBNot yet available
- Attch-4-SOW_LPS-TE-C-REV-1.pdf.pdf845 KBNot yet available
- z-Attch-11-CONST_WD-KS20260053_dtd-18May2026-TE-J.pdf.pdf1.9 MBNot yet available
Contacts
Similar contracts
- Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CTConnecticutDue Nov 12, 2026
- Exterior Cipher Locks and Exit Hardware Retrofit, HawaiiHawaiiDue Nov 21, 2026
- Elevator Maintenance & Related Services (Columbus, OH & Dayton, OH)OhioDue Nov 16, 2026
- WTX Elevator Inspections and Load Testing ServicesTexasDue Nov 16, 2026
- N--UIL Generator ReplacementWashingtonDue Nov 17, 2026
- FILA Elevator and vertical lift inspection servicesDue Nov 10, 2026