Backflow Preventer Upgrades
- Response deadline
- Aug 31, 2026 Closed
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
Update: Included RFI's, Updated SOW, site visit power point and site visit attendance sheet, and included site pictures This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.202(b), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation will not be issued. The Kansas Air National Guard, McConnell AFB, KS is seeking to award a firm fixed price contract to vendor to complete work consisting of removal and replacement of five backflow preventer systems in accordance with the statement of work. Period of performance is 60 days from date of award. This project is set aside 100% for small business. Organized Site Visit has been scheduled for 12 August 2026 at 0900 CDT. See solicitation for futher instructions. For questions and quote submission contact: 184WG.MSG.CONTRACTING@us.af.mil Attachements: Combined Synopsis Solicitation SoW - Backflow preventor Upgrades W50S7XQ0010 Prov_Clauses Wage Determination RFIs Site Visit Powerpoint slides Site Visit attendance - Redacted Site pictures
Classifications
Documents (8)
- DownloadRFIs- Backflow Preventors - 12Aug26.xlsx.xlsx17 KB
- DownloadCombined Synopsis Solicitation Backflow Preventer.pdf.pdf160 KB
- DownloadSite Visit Slides - Backflow Preventer.pptx.pptx881 KB
- DownloadKS Wage Determination 15-5341.txt.txt43 KB
- DownloadSite Visit - Backflow Preventer Attendance_Redacted.pdf.pdf556 KB
- DownloadBackflow Preventor Pictures.pdf.pdf1.5 MB
- DownloadSoW - Backflow Preventer Upgrades.pdf.pdf180 KB
- DownloadW50S7X26Q0010 Prov_Clauses.pdf.pdf38 KB
Contacts
Similar contracts
- E21 Prca HVAC ReplacementDue Oct 27, 2026
- Lower Monumental PH HVAC System UpgradeWashingtonDue Oct 5, 2026
- 16292 Steam Boiler ReplacementUtahDue Oct 19, 2026
- Con | Z1Da | Replace or Chillers | 580-23-105 | PresolicitationTexasDue Oct 12, 2026
- Con | Z2Da | Replace Chiller 1 B104 | 580-24-111 | PresolicitationTexasDue Oct 13, 2026
- AOML HVAC and BAS Controls Upgrade ProjectFloridaDue Sep 29, 2026