B44 Breakroom Remodel
- Response deadline
- Aug 27, 2026 Due in 6 days
- Date posted
- Aug 21, 2026
- Source
- Open notice
Description
Update 8/21/2026 - Updated RFIs and included redeacted site Visit sign in sheet from site visit Update 8/12/2026 - Corrected missmatching dates on solicitation document Update 8/11/2026 - Uploaded RFIs and included site visit date and location in solicitation Update 8/6/2026 - Uploaded RFIs and Electrical Mechanical Plumbing As builts Update: 7/29/2026 - Uploaded SOW that is not CUI This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.202(b), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation will not be issued. Work shall consist of the removal of the old cabinetry in room 103 and room 106 (breakroom) of B44 and the installation of new cabinets, countertops, microwaves, backsplash, a large under-the-counter refrigerator, sink, faucet, countertop water dispenser, and all necessary plumbing to accommodate these installs. Details in the attached Statement of Work (SOW) Period of Performance will be 60 days from date of award at Building 44, 52970 Jayhawk Drive, McConnell AFB, KS 67221. An Organized Site Visit has been scheduled for August 17th, 2026, at 1300 CST at 52955 Jayhawk Drive, Bldg. 65, Suite 153. Additional informaion in solicitation Provide all questions and offers to email: 184WG.MSG.CONTRACTING@us.af.mil ATTACHMENTS: Combined Synopsis Solicitation - Amend Clauses SoW Wage Determination B44 Break Room Remodel Drawings RFIs - Updated Electrical Mechanical Plumbing As builts Site Visit attendance sheet - Redacted
Classifications
Documents (8)
- Combined Synopsis Solicitation B44 Breakroom Remodel - Amend 2.pdf.pdf151 KBNot yet available
- B44 Break Room Remodel Drawings.pdf.pdf836 KBNot yet available
- Break Room remodel Site Visit_Redacted.pdf.pdf382 KBNot yet available
- SoW B44 Breakroom FY26.pdf.pdf199 KBNot yet available
- Wage Determination 15-5341 (1).txt.txt43 KBNot yet available
- RFI - B44 Breakroom Remodel - Aug_21_2026.xlsx.xlsx20 KBNot yet available
- PRQE_072247 2019 Project Elec_Mech_Plumb_Asbuilts_20260804.pdf.pdf3.4 MBNot yet available
- W50S7X26Q0008_Clauses.pdf.pdf35 KBNot yet available
Contacts
Similar contracts
- Deck and Gate Replacements, Camp Edwards, Joint Base Cape Cod, Buzzards Bay, MADue Aug 27, 2026
- Deck and Gate Replacements, Camp Edwards, Joint Base Cape Cod, Buzzards Bay, MADue Aug 27, 2026
- Z--WEAR PMIS 344184B & BELA 352775A WINDOWSDue Sep 9, 2026
- Conex Refurbishment, Officer Training School (OTS), Maxwell AFBAlabamaDue Sep 8, 2026
- MORU VC GLASS & DOOR REPLACEMENTDue Sep 9, 2026
- Deck and Gate Replacements, Camp Edwards, Joint Base Cape Cod, Buzzards Bay, MADue Aug 27, 2026