SAM.govN6264926RA067
Open
FY26 SEARAY BARGE OVERHAUL
DEPT OF DEFENSE · Kanagawa
- Response deadline
- Aug 28, 2026 Due in 17 days
- Date posted
- Aug 11, 2026
- Source
- Open notice
Description
The contractor shall accomplish the work specification package as outlined in the provided drawings and specification, and as attached in Section J ATTACHMENT (I). The contractor will be responsible for ship repair work to include providing the necessary management, scheduling, testing, quality assurance, technical documentations to support the SEARAY BARGE FY26 OVERHAUL. NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification, or a DoD recognized unique identification equivalent.
Classifications
Documents (19)
- DownloadAttachment I Statement of Work (SOW).pdf.pdf310 KB
- DownloadContract Data Requirements List (CDRL)_SOW c.(4) Final Inspection Report.pdf.pdf53 KB
- DownloadContract Data Requirements List (CDRL)_SOW c.(5) Final Condition Report.pdf.pdf53 KB
- DownloadContract Data Requirements List (CDRL)_SOW a.(1) Working Plan.pdf.pdf53 KB
- DownloadAttachment III Request for Information Form (Fillable).pdf.pdf108 KB
- DownloadContract Data Requirements List (CDRL)_SOW a.(5) Work Schedule.pdf.pdf53 KB
- DownloadContract Data Requirements List (CDRL)_SOW c.(1) Work Summary.pdf.pdf53 KB
- DownloadAttachment VI Source of Repair Instruction.pdf.pdf960 KB
- DownloadSolicitation - N6264926RA067.pdf.pdf2.4 MB
- DownloadContract Data Requirements List (CDRL)_SOW a.(2) Repair Plan.pdf.pdf53 KB
- DownloadContract Data Requirements List (CDRL)_SOW c.(2) Details of Working.pdf.pdf53 KB
- DownloadContract Data Requirements List (CDRL)_SOW a.(3) Paint Schedule.pdf.pdf53 KB
- DownloadContract Data Requirements List (CDRL)_SOW c.(3) Final Material List.pdf.pdf53 KB
- DownloadAttachment V Warranty Tracking Information.pdf.pdf965 KB
- DownloadAttachment II Price Proposal Form.xlsx.xlsx27 KB
- DownloadContract Data Requirements List (CDRL)_SOW b.(1)(2) Inspect Test Repor.pdf.pdf53 KB
- DownloadContract Data Requirements List (CDRL)_SOW a.(4) Material List.pdf.pdf53 KB
- DownloadAttachment IV GFP listing.pdf.pdf4 KB
- DownloadContract Data Requirements List (CDRL)_SOW b.(3) Condition Report.pdf.pdf53 KB
Contacts
- peterjommel.s.arrieta.ln@us.navy.mil0081468166294
- kazuo.takamura.ln@us.navy.mil0081468166187
Similar contracts
- LPD-18 No.3 SSDG Crankshaft FR and RR Seal; replaceNagasakiDue Aug 27, 2026
- LHA-7 NO ONE JP-5 SERVICE PUMP AND MOTOR REPAIRNagasakiDue Aug 27, 2026
- LPD-18 Scuttle 1-21-2 in Forecastle Deck replaceNagasakiDue Aug 19, 2026
- LHA7 Eye Wash and Associated Equipment in 03-71-1-Q installNagasakiDue Aug 19, 2026
- LHA-7 Fan Room and Vent Plenum in 02-114-2-Q; refurbishNagasakiDue Aug 28, 2026
- 47--FLAT BELT,EXPANSIONDue Aug 21, 2026