Kahauiki Stream Maintenance Dredging, Phase 2, Fort Shafter Flats, Oahu, Hawaii
- Response deadline
- Jul 1, 2026 Closed
- Date posted
- Apr 22, 2026
- Source
- Open notice
Description
Project Location: Fort Shafter Flats, Oahu, Hawaii. This design-bid-build (DBB) project is to dredge and clear two (2) sections of Kahauiki Stream, clean out two (2) existing concrete culverts drainpipes on one section, and an option to replace one of the concrete culverts drainpipes. the major elements of the scope of work include, but are not limited to pre-mobilization activities; compliance with applicable environmental requirements; mobilization which includes preparation of temporary construction staging and dewatering areas; dredging of accumulated sediments; transportation of material according to specified environmental best management practices; testing of dredged material prior to upland disposal; transportation of the dewatered sediments to the pvt landfill as the upland disposal site; and, demobilization which includes the restoration of the temporary construction staging and dewatering areas to their original condition.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR CAPE MAY TO LOWER TOWNSHIP, NEW JERSEY, BRIGANTINE INLET TO GREAT EGG HARBOR INLET (ABSECON ISLAND), NEW JERSEY, AND BARNEGAT INLET TO LITTLE EGG, INLETNew JerseyDue Nov 2, 2026
- Corinth National Cemetery, 838Cm3036 – Gravesite Expansion and Cemetery ImprovementsMississippi
- SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)DelawareDue Nov 2, 2026
- Mill Springs National Cemetery Gravesite ExpansionKentucky
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 18-Inch Diameter), Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging within the Vicksburg DistrictMississippiDue Oct 23, 2026
- Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund SiteDue Nov 20, 2026