SAM.gov36C24826Q0895
Open
J065--Amended-FY27: GE Assurepoint Preventative Maintenance SDVOSB
- Response deadline
- Aug 24, 2026 Due in 5 days
- Date posted
- Aug 19, 2026
- Source
- Open notice
Description
The revised SOW now reflects that only required Preventive/Planned Maintenance (PM) coverage that includes any parts replacement mandated by the manufacturer PM procedure. Down time and response time do not pertain to the PM coverage.
Classifications
Documents (4)
- Amend 36C24826Q0895 0001.pdf.pdf176 KBNot yet available
- Amend RFQ 36C24826Q0895_2.pdf.pdf693 KBNot yet available
- 36C24826Q0895 0001.docx.docx26 KBNot yet available
- 36C24826Q0895_2.docx.docx128 KBNot yet available
Contacts
- Contract Specialistmichael.shook@va.gov8139277566
Similar contracts
- Post-warranty Preventive Maintenance and Repair Services on a Perkin Elmer Hyphenated Thermogravimetric Analyzer with Fourier Transformed Infrared Spectroscopy-Gas Chromatography-Mass spectrometer (TGA-FTIR-GCMS) SystemArkansasDue Aug 26, 2026
- **Brand Name Mandatory** - Fuse Series 3D Printer Recert and Annual ServiceMarylandDue Sep 3, 2026
- FOPR for B-1B Advanced Radar/Electronic Warfare Test Station (ARTS)GeorgiaDue Sep 3, 2026
- EDAX Pegasus Electron Microscope Maintenance and ServicesDistrict of ColumbiaDue Aug 21, 2026
- Replacement of turbo pump by ManufacturerDistrict of ColumbiaDue Aug 21, 2026
- MN ARNG Fire Department Flow TestMinnesotaDue Aug 31, 2026