Fire Smoke Damper Inspection and Maintenance For The Captain James A Lovell FHCC, North Chicago, Illinois
- Response deadline
- Aug 27, 2026 Closed
- Date posted
- Aug 21, 2026
- Source
- Open notice
Description
This amendment incorporates the Government s responses to questions submitted by potential offerors. These questions and corresponding answers are provided for clarification purposes only and do not revise or otherwise change the requirements unless explicitly stated within this amendment. Can the VA identify the specific type/model of fusible links currently installed on those dampers? A: Please see attached pictures for reference If that information is not readily available, would it be possible to provide several clear photographs of the existing fusible links from different angles? A: Photos are attached If the existing components are ETL-type fusible links, please clarify whether the intended scope is to replace all such links or only those found to be rusted, damaged, defective, or otherwise requiring replacement. A: ETL- type are not to be replaced unless requiring replacement per NFPA and manufacturer specifications (rusted, damaged, defective, etc.) Can the VA provide existing drawings of the buildings if available? A: Existing drawings will be provided to the awardee. These drawings include several buildings in accordance with the PWS and identify smoke damper locations. However, this is not an all-inclusive list as there are smoke dampers that have yet to be identified within the buildings mentioned in the PWS. All other terms and conditions remain unchanged. The RFQ response date remains unchanged.
Classifications
Documents (4)
- 36C25226Q0654 0001.docx.docx20 KBNot yet available
- Fusible Links Currently Installed.jpeg.jpeg4.0 MBNot yet available
- Wage Determination Lake County Illinois_5Aug2026_Rev31.pdf.pdf1.2 MBNot yet available
- 36C25226Q0654_Fire Smoke Damper Inspection_Solicitation_5Aug2026.pdf.pdf556 KBNot yet available
Contacts
- Contract Specialisteric.king2@va.gov414-844-4800
Similar contracts
- Annual/Sem-i annual fire smoke inspections and auto door services l EKHKansasDue Oct 23, 2026
- OKC Elevator Test and Inspection (Semi Annual and Annual Service)OklahomaDue Oct 19, 2026
- Palo Alto VAHCS 3rd Party Elevator Inspection ServicesCaliforniaDue Oct 14, 2026
- NTX Elevator Inspection | BASE + OPTIONS | 549 | NEED DATE 12.2026TexasDue Oct 30, 2026
- Vegetation Control_Embankments, Weed Control Railroad Tracks, USAG BavariaDue Nov 2, 2026
- NTX Elevator Inspection | BASE + OPTIONS | 549 | NEED DATE 12.2026TexasDue Oct 30, 2026