J--Haulout of the R/V Sturgeon
- Response deadline
- Sep 9, 2026 Due in 5 days
- Date posted
- Sep 4, 2026
- Source
- Open notice
Description
Amendment 0004 provides response to question received via email. Question: Due to the unknown of the new load line survey inspection requirement, we would like to propose the work listed on Work Item 6.3 should be performed as stated, but any additional work that is required above that for the issuance of a new load line certificate be handled under a CFR. The following is the new proposed changes: (Changes are shown in parenthesis). 6.3 ABS Survey - Load Line: The Contractor shall perform the following tasks in support of the vessel¿s load line special survey. All items shall be completed and/or tested to the satisfaction of the ABS Surveyor. The Contractor shall be responsible for scheduling and coordinating with the ABS Surveyor for the inspections and (Contractor will submit a CFR) for any additional tasking that the ABS Surveyor determines is necessary for the (load line survey). Answer: The Government agrees to this change.
Classifications
Documents (16)
- Attachment_4_26-105-921-R-_Preliminary_Hydrophone_Installation.pdf.pdf307 KBNot yet available
- Attachment_8_W_W_Williams_Proposal_RV_Sturgeon_Engine_and_Gear_Refresh_0001.pdf.pdf982 KBNot yet available
- Sol_140G0226R0020_Amd_0003.pdf.pdf201 KBNot yet available
- Attachment_7_Dimensions_of_Hydrophones_NC_1-08_Shielded_4_Post_0001.png.png51 KBNot yet available
- Sol_140G0226R0020_Amd_0002.pdf.pdf202 KBNot yet available
- Attachment_3_PWS_Sturgeon_Shipyard_2026.docx.docx28 KBNot yet available
- Attachment_12_Question_and_Answers_for_Haulout_of_Sturgeon_0003.pdf.pdf190 KBNot yet available
- Sol_140G0226R0020_Amd_0004.pdf.pdf202 KBNot yet available
- Sol_140G0226R0020_Amd_0001.pdf.pdf203 KBNot yet available
- Sol_140G0226R0020.pdf.pdf572 KBNot yet available
- Attachment_1_Appendix-_Sturgeon.pdf.pdf368 KBNot yet available
- Attachment_11_D410011-ANchor_Handling_Arrangement_0003.pdf.pdf521 KBNot yet available
- Attachment_2_RV_Sturgeon_Specifications.docx.docx258 KBNot yet available
- Attachment_9_Centek_Marine_Quote_20734_0001.pdf.pdf800 KBNot yet available
- Attachment_10_Hydrophone_InstallationManual_en_V2_0002.pdf.pdf9.3 MBNot yet available
- Attachment_5_Schedule_of_Work_Items.docx.docx37 KBNot yet available
Contacts
- bwilson@usgs.gov573-397-2277
Similar contracts
- Dockside (DS) – USCGC STORIS Fiscal Year 2027WashingtonDue Sep 14, 2026
- Usns Joshua Humphreys (T-Ao 188) Fy27 Roh/DdDue Sep 8, 2026
- Redacted J&A - Ship Service Turbine Generator (SSTG) Enterprise ContractCalifornia
- Overhaul - Barrier BoatMaineDue Sep 11, 2026
- Hawaii Class II Research VesselHawaiiDue Sep 25, 2026
- USCGC HATCHER DryDock Repairs FY27Due Sep 21, 2026