Building 20 Atrium Leak Mitigation
- Response deadline
- Sep 24, 2026 Due in 16 days
- Date posted
- Sep 8, 2026
- Source
- Open notice
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX26Q0107 is issued as a Request for Quotation (RFQ) for Building 20 Atrium Leak Mitigation IAW Attachment 1 - Statement of Work: The intent of this project is to complete inspection and testing of the Building 20 atrium system and provide a report summarizing the source of water leaks that includes photos to document the condition atrium system with recommended repairs that have a cost estimate based on the year of the inspection. The report shall be in order by location and by the urgency of the repair in a prioritized manner. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238160 – Roofing Contractors The small business size standard is $19M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Classifications
Documents (6)
- Attachment 2 - Photos Drawings.pdf.pdf23.3 MBNot yet available
- Attachment 5 - QASP.doc.doc44 KBNot yet available
- Attachment 1 - Statement of Work.docx.docx69 KBNot yet available
- Attachment 4 -Site Map for Visitors.pdf.pdf141 KBNot yet available
- Attachment 3 - Wage Determination.pdf.pdf224 KBNot yet available
- 127EAX26Q0107.pdf.pdf312 KBNot yet available
Contacts
Similar contracts
- USDA-ARS Mississippi Roofing Repairs - Multi LocationsMississippiDue Sep 18, 2026
- Shelter Roof Replacement, Buffumville Lake, Charlton, MADue Sep 14, 2026
- Cheyenne River Agency RoofingDue Sep 15, 2026
- Z--POCOSIN LAKES NWR Roof Repair of Field StationDue Sep 11, 2026
- Z--Missoula Field Office RenovationDue Sep 15, 2026
- Z--Replace Roof Surfaces on Dewa LocationsDue Sep 14, 2026