Intracoastal Waterway Maintenance Dredging Vicinity of Bakers Haulover, Miami-Dade County, Florida
- Response deadline
- May 13, 2026 Closed
- Date posted
- Apr 23, 2026
- Source
- Open notice
Description
THIS NOTICE IS POSTED FOR INFORMATIONAL PURPOSES ONLY: NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP25R0010: AGM Marine Contractors Inc. (W912EP25D0011), AHTNA Marine and Construction Company LLC (W912EP25D0012), Atlantic and Gulf Dredging and Marine LLC (W912EP25D0013), Coastal Dredging Co., Inc. (W912EP25D0014), Cottrell Contracting Corporation (W912EP25D0015), Next Generation Logistics LLC. (W912EP25D0016), Southern Dredging Co, Inc. (W912EP25D0017), Southwind Corporation Corp. (W912EP25D0018) and Waterfront Property Servies LLC Gator Services (W912EP25D0019). DESCRIPTION OF WORK: Project consists of maintenance dredging the Intracoastal Waterway (IWW) channel and settling basin in the vicinity of Baker Haulover. Place excavated material in the beach placement area south of Bakers Haulover Inlet, as shown on the plans. Incidental work includes but not limited to environmental monitoring, water quality monitoring, benthic surveys, beach fill quality control, vibration control and monitoring, and beach tilling. The Request for Proposals (RFP) will be issued on or about 13 April 2026 and proposals will be due on or about 13 May 2026. NAICS Code 237990, Dredging and Surface Cleanup Activities. The Small Business Standard is $37 million. The Price Target Range is between $1,000,000.00 and $5,000,000.00. The period of performance associated with this requirement is: 100 calendar days after receipt of the Notice to Proceed (NTP). The contractor shall commence work within 60 calendar days of receipt of the Notice to Proceed (NTP). THIS IS A TOTAL SMALL BUSINESS SET-ASIDE REQUIREMENT.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
- FWS - Pixley NWR Water Recirculation Design-BuildDue Nov 30, 2026
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 24-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - JBJ WaterwayMississippiDue Nov 16, 2026
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 18-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - MS River HarborsMississippiDue Nov 16, 2026
- St. Lucie South Jetty Repair Industry DayFloridaDue Dec 7, 2026
- Repair Aids to Navigation (ATON) - Southern Area of USCG District NortheastConnecticutDue Dec 8, 2026