Intent to Sole Source - 5G System for Lunar Surface Communications Evaluation and Radio Propagation Measurements
- Response deadline
- Jul 17, 2026 Closed
- Date posted
- Jul 13, 2026
- Source
- Open notice
Description
NASA Glenn Research Center (GRC) has a requirement to develop a minimum viable solution of a 5G New Radio (5G-NR) User Equipment (UE) and 5G Network-In-a-Box (NIB). The solution must be developed with integrated Wi-Fi 6 and the key features needed to successfully demonstrate the network solution on the lunar surface and accelerate the technology readiness level (TRL) in anticipation of operational readiness for subsequent lunar missions. See Attachment A – Statement of Work for the details. NASA GRC intends to issue a sole source contract to acquire Research and Development from MODULATE SPACE CORPORATION (also known as Modul8, formerly Nokia Bell Labs’ Space Communication Solutions) under the authority of FAR 6.103-1, Only one responsible source and no other supplies or services will satisfy agency requirements. The Government intends to acquire a commercial product or commercial service. Interested organizations may submit their capabilities and qualifications to perform the effort electronically via email to Ian Park at ian.park@nasa.gov not later than 4:00PM EDT on Friday, July 17th, 2026. Such capabilities/qualifications will be evaluated solely for the purpose of determining whether to conduct this acquisition on a competitive basis. A decision by the Government not to compete this acquisition on a full and open competition basis, based upon responses to this notice, is solely within the discretion of the Government. NASA Clause 1852.215-84, Ombudsman, is applicable. The Center Ombudsman for this acquisition can be found at: https://www.hq.nasa.gov/office/procurement/regs/Procurement-Ombuds-Comp-Advocate-Listing.pdf
Documents (1)
- Attachment A - SOW - 5G System for Lunar Surface Communications Evaluation.pdf.pdf276 KBNot yet available
Contacts
Similar contracts
- Development of Additional Payload Processing Capability on North Wallops Island at Wallops Flight FacilityVirginiaDue Oct 30, 2026
- Development of Additional Launch Capacity on South Wallops Island at Wallops Flight FacilityVirginiaDue Oct 30, 2026
- Modular vacuum chamber 2x2x2 with accessoriesFloridaDue Sep 1, 2026
- Launch Vehicle Probabilistic Reliability Risk Analysis ServicesCaliforniaDue Sep 11, 2026
- Micro x-ray source for defect detection in metallic AM structuresVirginiaDue Aug 28, 2026
- Series 3710 Test Oven and control systemVirginiaDue Aug 28, 2026